Project details
| Status | Initial checks |
|---|---|
| Status since | 12 Mar 2024 |
| Application filed | 12 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Orissa Alloy Steel PVT. LTD. |
| Land area | 301.4 acres (122 ha) |
| Project cost | ₹2,900 crore |
| Village / locality | Bargai |
| Taluk / tehsil | Kharagpur - I |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00521 |
In context
43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 301.4 acres, this one is larger than 58% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bargai, Kharagpur - I, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks, 50 m away
- Assessment of No Increase in Pollution Load for Enhancement of Coke Oven Plant… — initial checks, 750 m away
- Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) &… — environmental approval granted, 1.1 km away
- Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) &… — cleared for impact study, 1.1 km away
- Expansion of Integrated Steel Plant from 2.0 million TPA with 385 MW CPP to… — initial checks, 1.4 km away
- Proposed Expansion-cum-Modification of existing steel plant at Industrial… — withdrawn, 2 km away
- Expansion-cum-modification of existing integrated steel plant located at… — cleared for impact study, 2.1 km away
- Modernization-cum-expansion of Integrated Steel Plant (0.3 MTPA to 0.7 MTPA)… — environmental approval granted, 2.1 km away
More from Orissa Alloy Steel PVT. LTD. in Medinipur West
- Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel) — initial checks
- Assessment of No Increase in Pollution Load for Product Mix in Beneficiation… — initial checks
- Assessment of No Increase in Pollution Load for Enhancement of Coke Oven Plant… — initial checks
- Integrated Steel Plant of capacity 0.9 Million Ton per Annum (Finished Steel) — environmental approval granted
5 Orissa Alloy Steel projects in Medinipur West
All 12 Orissa Alloy Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.