Quick answers
What is Proposed Installation of Ferro-Alloy Plant (SAF 2x9 MVA)?
Proposed Installation of Ferro-Alloy Plant (SAF 2x9 MVA) is a lapsed industrial project in Part Ii, Haldia, Purba Medinipur, West Bengal. The site covers 22.7 acres.
Who is building it?
The applicant is Petro Carbon and Chemicals Private Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Part Ii, Haldia, Purba Medinipur, West Bengal.
How big is it?
It has a stated cost of ₹38 crore and a site of 22.7 acres.
When was it filed?
The application was filed on 21 Nov 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 21 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Petro Carbon and Chemicals Private Limited |
| Land area | 22.7 acres (9.2 ha) |
| Project cost | ₹38 crore |
| Village / locality | Part Ii |
| Taluk / tehsil | Haldia |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00112 |
In context
27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 22.7 acres, this one is smaller than 63% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Part Ii, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environment Clearance w.r.t. Thermal Power Plant located at JL –… — environmental approval granted, 3.6 km away
- Environmental Clearance (Ec) Amendment for Increasing Propylene Production… — lapsed, 5.4 km away
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — environmental approval granted, 5.5 km away
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — returned to applicant, 5.5 km away
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — cleared for impact study, 5.5 km away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 5.5 km away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 5.5 km away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 5.5 km away
More from Petro Carbon and Chemicals Private Limited in Purba Medinipur
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — returned to applicant
- Expansion of existing Calcined Petroleum Coke plant of 93,744 TPA capacity by… — lapsed
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — cleared for impact study
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — cleared for impact study
All 7 Petro Carbon and Chemicals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.