| Status | Environmental approval granted |
|---|---|
| Status since | 11 Feb 2025 |
| Application filed | 18 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Captain Steel India Limited |
| Land area | 33.7 acres (13.6 ha) |
| Project cost | ₹200.9 crore |
| Village / locality | Debipur |
| Taluk / tehsil | Asansol Kulti Township |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00562 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 18 Dec 2024 (this page) | Environmental approval granted | 33.7 acres | ₹200.9 crore |
| Early planning filed 22 Aug 2023 | Cleared for impact study | 33.7 acres | ₹200.9 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 33.7 acres, this one is larger than 53% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Debipur, Asansol Kulti Township, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in the configuration of Induction Furnace by replacing 4x25T with… — initial checks, 0 m away
- Expansion in SMS Unit to increase the production of MS Billets from 2,07,360… — cleared for impact study, 0 m away
- Proposed Capacity enhancement from 1,20,000 TPA to 2,07,360 TPA Billets/Rolled… — environmental approval granted, 0 m away
- Maheshpur Black Stone Mine — environmental approval granted, 650 m away
- Transfer of Environment Clearance (EC) granted by MoEF&CC, New Delhi Vide… — lapsed, 1.5 km away
- Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA… — lapsed, 2.1 km away
- Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA… — cleared for impact study, 2.1 km away
- Steel plant for production of 4,29,000 TPA Sponge Iron, 4,12,500 TPA MS… — under environmental review, 2.1 km away
More from Captain Steel India Limited in Paschim Bardhaman
- Change in the configuration of Induction Furnace by replacing 4x25T with… — initial checks
- Proposed Capacity enhancement from 1,20,000 TPA to 2,07,360 TPA Billets/Rolled… — environmental approval granted
All 4 Captain Steel India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.