Greenfield Integrated steel plant(1.0 MTPA – Million Ton /Annum) consists of DRI Plant(630000 TPA),Power Plant(90 MW),Submerged Arc Furnace(126000 TPA),Induction Furnace(240000 TPA),Argon Oxygen Decarburization(180000 TPA),Ladle Refining(90000 TPA),Oxygen/Argon/Nitrogen Plant(1800 NM3/hr.),Caster Unit(24000 TPA), Reheating Furnace(90000 TPA),Rolling Mill(0.5 MTPA), Flat Steel(0.5 MTPA),Pellet Plant(1 MTPA),Coke Oven(0.2 MTPA) & Fly Ash Brick (10 Million/Year) by Berry Alloys Limited

Greenfield Integrated steel plant(1.0 MTPA – Million Ton /Annum) consists of DRI Plant(630000 TPA),Power Plant(90 MW),Submerged Arc Furnace(126000 TPA),Induction Furnace(240000 TPA),Argon Oxygen Decarburization(180000 TPA),Ladle Refining(90000 TPA),Oxygen/Argon/Nitrogen Plant(1800 NM3/hr.),Caster Unit(24000 TPA), Reheating Furnace(90000 TPA),Rolling Mill(0.5 MTPA), Flat Steel(0.5 MTPA),Pellet Plant(1 MTPA),Coke Oven(0.2 MTPA) & Fly Ash Brick (10 Million/Year) by Berry Alloys Limited is a proposed industrial project in Dhurasol, Garbeta - Iii, Medinipur West, West Bengal. The site covers 88.7 acres. Its stated project cost is ₹1,718.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Apr 2025).

See it on the live map All projects in Medinipur West

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since29 Apr 2025
Application filed19 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBerry Alloys Limited
Land area88.7 acres (35.9 ha)
Project cost₹1,718.4 crore
Village / localityDhurasol
Taluk / tehsilGarbeta - Iii
DistrictMedinipur West
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00605

In context

43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 88.7 acres, this one is smaller than 60% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhurasol, Garbeta - Iii, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.