Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Jul 2024 |
| Application filed | 10 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ramesh Kumar Jhunjhunwala |
| Land area | 70.6 acres (28.6 ha) |
| Project cost | ₹202 crore |
| Village / locality | Dhurasol |
| Taluk / tehsil | Garbeta - Iii |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00684 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 26 Sept 2024 | Not approved | 70.6 acres | ₹202 crore |
| Early planning filed 10 May 2024 (this page) | Cleared for impact study | 70.6 acres | ₹202 crore |
In context
43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 70.6 acres, this one is smaller than 65% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhurasol, Garbeta - Iii, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project for manufacturing of 300000 TPA Cold Rolling / Galvanized… — not approved, 0 m away
- Greenfield Integrated steel plant(1.0 MTPA – Million Ton /Annum) consists of… — cleared for impact study, 50 m away
- Integrated Steel Plant with captive Power Plant having capacity of 1 MTPA — lapsed, 1.3 km away
- Integrated Steel Plant with captive Power Plant having capacity of 1 MTPA — not approved, 1.3 km away
- Drawal of 11 KV Overhead Line Through Small Portion of Forest Area Near… — more information requested, 5 km away
- Drawal of 11 KV Overhead Line Through Small Portion of Forest Area Near… — lapsed, 5 km away
- Dhengadaha Morrum Mine — environmental approval granted, 11.7 km away
- Proposed 2x800 MW Coal Based Ultra Super Critical Thermal Power Plant coming… — environmental approval granted, 12.7 km away
About this information