One of 2 filings for this project. The project's main page, with every filing and where each stands: Drawal of 11 KV Overhead Line Through Small Portion of Forest Area Near Parimal Kanan…
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 2 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | WEST BEngal STATE Electricity distribution company limited |
| Land area | 1,400 m² |
| Forest land | 1,450 m² |
| Project cost | ₹10 lakh |
| Village / locality | Dwarigeria |
| Taluk / tehsil | Garbeta - Iii |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02261 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Jun 2026 | More information requested | 0.3 acres | ₹10 lakh |
| New project filed 2 Jan 2026 (this page) | Lapsed | 0.3 acres | ₹10 lakh |
In context
11 applications in Medinipur West since January 2022 are in the same category (Power): 2 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 82% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dwarigeria, Garbeta - Iii, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Drawal of 11 KV Overhead Line Through Small Portion of Forest Area Near… — more information requested, 0 m away
- Integrated Steel Plant with captive Power Plant having capacity of 1 MTPA — lapsed, 3.9 km away
- Integrated Steel Plant with captive Power Plant having capacity of 1 MTPA — not approved, 3.9 km away
- Greenfield Integrated steel plant(1.0 MTPA – Million Ton /Annum) consists of… — cleared for impact study, 5 km away
- Greenfield Project for manufacturing of 300000 TPA Cold Rolling / Galvanized… — not approved, 5 km away
- Greenfield Project for manufacturing of 300000 TPA Cold Rolling / Galvanized… — cleared for impact study, 5 km away
- Dhengadaha Morrum Mine — environmental approval granted, 8.5 km away
- [SM/06368] 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation… — lapsed, 10.6 km away
All 10 West Bengal State projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.