Cleared for impact studyIndustry · Paschim Bardhaman, West Bengal

Greenfield Steel Project comprising of establishment for Sponge Iron Plant(210000 TPA) with 2x350 TPD DRI Kiln , SMS with CCM for producing Billets/ Ingots/Hot Billets of 300000 TPA with 4x25T IF, Rolling Mill with Standby RHF of 2x25 TPH for producing TMT Bars/MS Angle /Channel/ Joint/ Round/ Square/ Hexagonal/Wire Rod/Strip of 270000 TPA, Ferro Alloy Plant (12MVA SAF) for producing Si-Mn-24000TPA or Fe-Mn-30000TPA or Fe-Si-13000TPA, slag crusher(2x10 TPH) & CPP-30 MW(WHRB-18 MW+AFBC-12 MW)

Greenfield Steel Project comprising of establishment for Sponge Iron Plant(210000 TPA) with 2x350 TPD DRI Kiln , SMS with CCM for producing Billets/ Ingots/Hot Billets of 300000 TPA with 4x25T IF, Rolling Mill with Standby RHF of 2x25 TPH for producing TMT Bars/MS Angle /Channel/ Joint/ Round/ Square/ Hexagonal/Wire Rod/Strip of 270000 TPA, Ferro Alloy Plant (12MVA SAF) for producing Si-Mn-24000TPA or Fe-Mn-30000TPA or Fe-Si-13000TPA, slag crusher(2x10 TPH) & CPP-30 MW(WHRB-18 MW+AFBC-12 MW) is a proposed industrial project in Babuisol, Ondal, Paschim Bardhaman, West Bengal. The site covers 85.1 acres. Its stated project cost is ₹455 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Sept 2024).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since9 Sept 2024
Application filed22 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantM/S Manbhum Ispat PVT LTD
Land area85.1 acres (34.5 ha)
Project cost₹455 crore
Village / localityBabuisol
Taluk / tehsilOndal
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00910

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Nov 2025Under environmental review85.1 acres₹455 crore
Early planning filed 22 Jul 2024 (this page)Cleared for impact study85.1 acres₹455 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 85.1 acres, this one is larger than 71% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Babuisol, Ondal, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.