Greenfield project for production of 70,500 TPA Billets through 1x350 TPD DRI kilns with Hydrogen Injection System,1x25T Induction Furnace with Billet Caster,2x20 T Gas Oxygen Refiner and 10MW Captive Power Plant by Raiseland Steels Pvt Ltd

Greenfield project for production of 70,500 TPA Billets through 1x350 TPD DRI kilns with Hydrogen Injection System,1x25T Induction Furnace with Billet Caster,2x20 T Gas Oxygen Refiner and 10MW Captive Power Plant by Raiseland Steels Pvt Ltd is an approved industrial project in Uhata, Raghunathpur - I, Puruliya, West Bengal. The site covers 118.7 acres. Its stated project cost is ₹150.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 29 Jul 2024).

See it on the live map All projects in Puruliya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield project for production of 70,500 TPA Billets through 1x350 TPD DRI kilns with Hydrogen Injection System,1x25T Induction Furnace with Billet Caster,2x20 T Gas Oxygen Refiner and 10MW Captive Power Plant by Raiseland Steels Pvt Ltd is an approved industrial project in Uhata, Raghunathpur - I, Puruliya, West Bengal. The site covers 118.7 acres.

Who is building it?

The applicant is M/S Raiseland Steels Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 29 Jul 2024), as of 27 Nov 2026.

Where is it?

In Uhata, Raghunathpur - I, Puruliya, West Bengal.

How big is it?

It has a stated cost of ₹150.7 crore and a site of 118.7 acres.

When was it filed?

The application was filed on 19 Apr 2024.

Project details

Official titleGreenfield project for production of 70,500 TPA Billets through 1x350 TPD DRI kilns with Hydrogen Injection System,1x25T Induction Furnace with Billet Caster,2x20 T Gas Oxygen Refiner and 10MW Captive Power Plant by Raiseland Steels Pvt Ltd at Village: Dhatara, P.S: Raghunathpur, Dist: Purulia, West Bengal
StatusEnvironmental approval granted
Status since29 Jul 2024
Application filed19 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantM/S Raiseland Steels Private Limited
Land area118.7 acres (48.1 ha)
Project cost₹150.7 crore
Village / localityUhata
Taluk / tehsilRaghunathpur - I
DistrictPuruliya
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00695

In context

33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 118.7 acres, this one is smaller than 52% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Uhata, Raghunathpur - I, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.