Cleared for impact studyIndustry · Bankura, West Bengal

Expansion in existing facility of Sponge Iron Plant of 72,000 TPA (2 x 100 TPD DRI Kiln-Operational based on CTO) by installation of additional 200 TPD DRI Kiln for manufacturing of Sponge Iron (1,20,000 TPA), Ferro Alloy Plant for product mix of Fe-Mn (23,436 TPA) or Si-Mn (18,810 TPA) or Fe-Si (10,212 TPA) with 11 MVA Submerged-arc Furnace and Captive Power Plant of 12 MW (WHRB#8 MW & Coal with Dolochar Based#4 MW) by M/s MB Ispat Corporation Limited

Expansion in existing facility of Sponge Iron Plant of 72,000 TPA (2 x 100 TPD DRI Kiln-Operational based on CTO) by installation of additional 200 TPD DRI Kiln for manufacturing of Sponge Iron (1,20,000 TPA), Ferro Alloy Plant for product mix of Fe-Mn (23,436 TPA) or Si-Mn (18,810 TPA) or Fe-Si (10,212 TPA) with 11 MVA Submerged-arc Furnace and Captive Power Plant of 12 MW (WHRB#8 MW & Coal with Dolochar Based#4 MW) by M/s MB Ispat Corporation Limited is a proposed industrial project in Baikunthapur, Barjora, Bankura, West Bengal. The site covers 21.4 acres. Its stated project cost is ₹157 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Jul 2024).

See it on the live map All projects in Bankura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in existing facility of Sponge Iron Plant of 72,000 TPA (2 x 100 TPD DRI Kiln-Operational based on CTO) by installation of additional 200 TPD DRI Kiln for manufacturing of Sponge Iron (1,20,000 TPA), Ferro Alloy Plant for product mix of Fe-Mn (23,436 TPA) or Si-Mn (18,810 TPA) or Fe-Si (10,212 TPA) with 11 MVA Submerged-arc Furnace and Captive Power Plant of 12 MW (WHRB#8 MW & Coal with Dolochar Based#4 MW) by M/s MB Ispat Corporation Limited is a proposed industrial project in Baikunthapur, Barjora, Bankura, West Bengal. The site covers 21.4 acres.

Who is building it?

The applicant is M B Ispat Corporation LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 9 Jul 2024), as of 27 Nov 2026.

Where is it?

In Baikunthapur, Barjora, Bankura, West Bengal.

How big is it?

It has a stated cost of ₹157 crore and a site of 21.4 acres.

When was it filed?

The application was filed on 2 Jul 2024.

Project details

StatusCleared for impact study
Status since9 Jul 2024
Application filed2 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantM B Ispat Corporation LTD
Land area21.4 acres (8.7 ha)
Project cost₹157 crore
Village / localityBaikunthapur
Taluk / tehsilBarjora
DistrictBankura
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00747

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 17 Dec 2025Lapsed21.4 acres₹157 crore
Early planning filed 2 Jul 2024 (this page)Cleared for impact study21.4 acres₹157 crore

In context

69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21.4 acres, this one is smaller than 51% of them.

28 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baikunthapur, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.