Quick answers
What is this project?
Expansion in existing facility of Sponge Iron Plant of 72,000 TPA (2 x 100 TPD DRI Kiln-Operational based on CTO) by installation of additional 200 TPD DRI Kiln for manufacturing of Sponge Iron (1,20,000 TPA), Ferro Alloy Plant for product mix of Fe-Mn (23,436 TPA) or Si-Mn (18,810 TPA) or Fe-Si (10,212 TPA) with 11 MVA Submerged-arc Furnace and Captive Power Plant of 12 MW (WHRB#8 MW & Coal with Dolochar Based#4 MW) by M/s MB Ispat Corporation Limited is a lapsed industrial project in Baikunthapur, Barjora, Bankura, West Bengal. The site covers 21.4 acres.
Who is building it?
The applicant is M B Ispat Corporation LTD.
Has it been approved?
No. The application was lapsed on 26 Nov 2026, so it is no longer under consideration.
Where is it?
In Baikunthapur, Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹157 crore and a site of 21.4 acres.
When was it filed?
The application was filed on 17 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in existing facility of Sponge Iron Plant of 72,000 TPA (2 x 100 TPD DRI…
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 17 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M B Ispat Corporation LTD |
| Land area | 21.4 acres (8.7 ha) |
| Project cost | ₹157 crore |
| Village / locality | Baikunthapur |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01195 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 17 Dec 2025 (this page) | Lapsed | 21.4 acres | ₹157 crore |
| Early planning filed 2 Jul 2024 | Cleared for impact study | 21.4 acres | ₹157 crore |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21.4 acres, this one is smaller than 51% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baikunthapur, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in existing facility of Sponge Iron Plant of 72,000 TPA (2 x 100 TPD… — cleared for impact study, 0 m away
- Proposed Sponge Iron Plant (2 X 350 TPD DRI Kilns) 0.231 MTPA, Induction… — lapsed, 550 m away
- Application for "No Increase in Pollution Load" Certificate for Change in… — initial checks, 1.2 km away
- Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing… — lapsed, 1.2 km away
- Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing… — environmental approval granted, 1.2 km away
- Proposed expansion project of the existing DRI Plant (2x100 TPD) by installing… — returned to applicant, 1.2 km away
- Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH — environmental approval granted, 1.8 km away
- Ferro-Alloy Plant (SAF 2x9 MVA) and Ferro-Chrome Briquetting Plant (10 TPH) — lapsed, 1.8 km away
All 3 M B Ispat Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.