Cleared for impact studyIndustry · Paschim Bardhaman, West Bengal

Expansion cum modification of existing Steel Plant by modification of existing Sinter Plant from (1X60 M2 + 2X26 M2) to (1X70 M2 + 2X30 M2), upgradation of existing 2X300 M3 MBF to 2X365 M3 MBF, upgradation of existing EAFs from (1X4 MVA + 4X3 MVA) to (5X4 MVA), expansion of existing DIP Plant from 6,04,800 TPA to 10,00,000 TPA and Installation of new units 1.8 MTPA Iron ore Beneficiation Plant, 1.2 MTPA Pellet Plant, 2,00,000 TPA PCI Plant, 1,11,680 TPA O2 Plant and 2,00,000 TPA Rolling Mill

Expansion cum modification of existing Steel Plant by modification of existing Sinter Plant from (1X60 M2 + 2X26 M2) to (1X70 M2 + 2X30 M2), upgradation of existing 2X300 M3 MBF to 2X365 M3 MBF, upgradation of existing EAFs from (1X4 MVA + 4X3 MVA) to (5X4 MVA), expansion of existing DIP Plant from 6,04,800 TPA to 10,00,000 TPA and Installation of new units 1.8 MTPA Iron ore Beneficiation Plant, 1.2 MTPA Pellet Plant, 2,00,000 TPA PCI Plant, 1,11,680 TPA O2 Plant and 2,00,000 TPA Rolling Mill is a proposed industrial project in Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The site covers 180 acres. Its stated project cost is ₹1,945 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Apr 2026).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since20 Apr 2026
Application filed10 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantJai Balaji Industries LTD
Land area180 acres (72.8 ha)
Project cost₹1,945 crore
Village / localityBamunara
Taluk / tehsilKanksa
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01574

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 12 Nov 2026Under environmental review180 acres₹2,315 crore
Early planning filed 10 Jan 2026 (this page)Cleared for impact study180 acres₹1,945 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 180 acres, this one is larger than 79% of them.

29 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

4 Jai Balaji Industries projects in Paschim Bardhaman
All 6 Jai Balaji Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.