Quick answers
What is 4G Saturation Project in uncovered village Sachapho Forest?
4G Saturation Project in uncovered village Sachapho Forest is a lapsed telecom project in Sachapho Forest, Kumargram, Alipurduar, West Bengal. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 2 Nov 2023, so it is no longer under consideration.
Where is it?
In Sachapho Forest, Kumargram, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹1 crore; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 1 Aug 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Nov 2023 |
| Application filed | 1 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Sachapho Forest |
| Taluk / tehsil | Kumargram |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01967 |
In context
42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sachapho Forest, Kumargram, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- BOP Jainti TF — decision issued, 950 m away
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — under wildlife review, 1.3 km away
- BOP Jainti — decision issued, 1.9 km away
- BOP Bhutiabasti — under wildlife review, 5.9 km away
- BOP Bhutanghat — decision issued, 6.8 km away
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat Camp (SSB,… — more information requested, 7 km away
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued, 7.1 km away
- 4g Saturation Project in Uncovered Village Bhutia Basti — lapsed, 8.5 km away
More from Mahesh Nair in Alipurduar
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Santlabari… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Lepchaka Camp (53 BN) — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.