Quick answers
What is this project?
Proposal for Tower construction under BOP/BIP Project at Bhutanghat Camp (SSB, Frontier HQ, Siliguri) is a proposed telecom project in Baruipara, Kumargram, Alipurduar, West Bengal. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Baruipara, Kumargram, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹1 crore and a site of 0 acres.
When was it filed?
The application was filed on 3 Jul 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Jul 2024 |
| Application filed | 3 Jul 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Baruipara |
| Taluk / tehsil | Kumargram |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02468 |
In context
42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baruipara, Kumargram, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued, 50 m away
- BOP Bhutanghat — decision issued, 350 m away
- BOP Raidak — decision issued, 5.9 km away
- BOP Jainti TF — decision issued, 6.2 km away
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — under wildlife review, 6.3 km away
- BOP Newland — decision issued, 6.7 km away
- 4G Saturation Project in uncovered village Sachapho Forest — lapsed, 7 km away
- BOP Newland-1 — decision issued, 8.3 km away
More from Mahesh Nair in Alipurduar
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Santlabari… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Lepchaka Camp (53 BN) — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.