Project details
| Status | More information requested |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 2 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Rango Forest |
| Taluk / tehsil | Gorubathan |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02024 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0 acres, this one is smaller than 82% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rango Forest, Gorubathan, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 1.1 km away
- PROPOSED 0.0607 HA LAND TO DIVERTED GRAVITY BASED PIPED WATER SUPPLY SCHEME… — more information requested, 1.3 km away
- 4G Saturation Project — forest land use approved, 1.3 km away
- The Diversion of 0.263ha of Forest Land for Construction of Fire Station at… — lapsed, 1.7 km away
- Fire station at Jholung under Patek Godak GP, under Gurubathan Block Dist:… — lapsed, 1.7 km away
- Paren Forest Piped Water Supply Scheme(Tsm/011674) — more information requested, 2.3 km away
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested, 2.4 km away
- Proposed 0.0192 Ha Land to Be Diverted Piped Water Supply Scheme From Chip… — more information requested, 2.6 km away
More from Mahesh Nair in Kalimpong
- 4G Saturation Project in Uncovered Village KITAPSI — more information requested
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested
- 4G saturation Project in uncovered village Mangpong Forest — forest land use approved
- 4G Saturation Project — forest land use approved
- 4G Saturation Project in uncovered village Lish Forest — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.