Project details
| Official title | 4G Saturation Project in uncovered village Tar Khola Sangay Road (Bhalukop khasmahal) |
|---|---|
| Status | Forest land use approved |
| Status since | 22 Apr 2024 |
| Application filed | 18 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Sangser Forest |
| Taluk / tehsil | Kalimpong - Ii |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02070 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0 acres, this one is smaller than 82% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sangser Forest, Kalimpong - Ii, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change of Name of User Agency from Lanco Energy Pvt. Limited to Lanco Teesta… — lapsed, 500 m away
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — forest land use approved, 1.2 km away
- JAL JEEVAN MISISON (JJM) SCHEME FOR GRAVITY BASED WATER SUPPLY SCHEME FOR… — more information requested, 1.9 km away
- 4 G Saturation Project in uncovered village 11th Mile Tumlang Khola — forest land use approved, 2.8 km away
- 4G Saturation Project in uncovered village Bhalukop Forest(7th Mile) — forest land use approved, 2.9 km away
- Proposed 0.0909 Ha Land to Be Diverted for Piped Water Supply Scheme From 9th… — more information requested, 4.4 km away
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested, 4.4 km away
- Veer Nari Smarak — lapsed, 4.5 km away
More from Mahesh Nair in Kalimpong
- 4G Saturation Project in Uncovered Village KITAPSI — more information requested
- 4G Saturation Project in Uncovered Village DALGAON — more information requested
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested
- 4G saturation Project in uncovered village Mangpong Forest — forest land use approved
- 4G Saturation Project — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.