Quick answers
What is this project?
The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel Ltd Project at Jaldapara National Park. Under Jaldapara Wildlife Division Coochbehar Jurisdiction is a lapsed telecom project in Umacharanpur, Falakata, Alipurduar, West Bengal. It seeks 0.3 acres of forest land.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 21 Mar 2026, so it is no longer under consideration.
Where is it?
In Umacharanpur, Falakata, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹8 lakh and 1,240 m² of forest land.
When was it filed?
The application was filed on 16 Sept 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel Ltd Project…
Project details
| Official title | Proposal for the diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel Ltd Project at Jaldapara National Park. Under Jaldapara Wildlife Division Coochbehar Jurisdiction. |
|---|---|
| Status | Lapsed |
| Status since | 21 Mar 2026 |
| Application filed | 16 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Forest land | 1,240 m² |
| Project cost | ₹8 lakh |
| Village / locality | Umacharanpur |
| Taluk / tehsil | Falakata |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02187 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Sept 2025 (this page) | Lapsed | ₹8 lakh | |
| New project filed 7 Jul 2024 | Not approved | 0.3 acres | ₹8 lakh |
| New project filed 28 Mar 2024 | Under wildlife review | 0.3 acres | ₹8 lakh |
In context
42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval.
Where it is
Umacharanpur, Falakata, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — under wildlife review, 250 m away
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — not approved, 400 m away
- 4g Saturation Project in Kodal Basty ( for Wild Life Clearance) — decision issued, 6.2 km away
- 4g Saturation Project in Kodal Basty — forest land use approved, 6.2 km away
- 4g Saturation Project in Kodal Basty — more information requested, 6.2 km away
- Water Supply Scheme Uttar Barajhar Forest Under Jal Jeevan Mission Within… — more information requested, 6.9 km away
- Water Supply Scheme Uttar Barajhar Forest Under Jal Jeevan Mission Within… — more information requested, 6.9 km away
- Water Supply Scheme Uttar Barajhar Forest Under Jal Jeevan Mission Within… — more information requested, 6.9 km away
More from Bharti Airtel Limited in Alipurduar
- The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel… — lapsed
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — forest land use approved
- The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel… — decision issued
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — decision issued
- Ofc Cable Laying Under Jaldhaka Wildlife Forest and Proposal of Ofc Laying on… — lapsed
8 Bharti Airtel (Airtel) projects in Alipurduar
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.