Quick answers
What is 4g Saturation Project in Kodal Basty?
4g Saturation Project in Kodal Basty is an approved telecom project in Kalaberia, Alipurduar - I, Alipurduar, West Bengal. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 7 Mar 2024), as of 27 Nov 2026.
Where is it?
In Kalaberia, Alipurduar - I, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹1 crore; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 9 Aug 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 7 Mar 2024 |
| Application filed | 9 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Kalaberia |
| Taluk / tehsil | Alipurduar - I |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02001 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Aug 2023 (this page) | Forest land use approved | 0 acres | ₹1 crore |
| New project filed 26 Jun 2023 | More information requested | 0 acres | ₹1 crore |
In context
42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalaberia, Alipurduar - I, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project in Kodal Basty ( for Wild Life Clearance) — decision issued, 0 m away
- 4g Saturation Project in Kodal Basty — more information requested, 0 m away
- Water Supply Scheme Uttar Barajhar Forest Under Jal Jeevan Mission Within… — more information requested, 650 m away
- Water Supply Scheme Uttar Barajhar Forest Under Jal Jeevan Mission Within… — more information requested, 650 m away
- Water Supply Scheme Uttar Barajhar Forest Under Jal Jeevan Mission Within… — more information requested, 650 m away
- The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel… — lapsed, 2.2 km away
- The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel… — decision issued, 2.2 km away
- Army Brigade Headquarters and Allied Units at Hasimara Military Station — under wildlife review, 2.9 km away
More from Mahesh Nair in Alipurduar
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Santlabari… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Lepchaka Camp (53 BN) — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.