What is Developing? Open the mapMap

Decision issuedRoads & highways · Alipurduar, West Bengal

The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha

The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha is a road project in Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal. The site covers 0 acres. Its stated project cost is ₹3 lakh. As of 27 Nov 2026, its status is “Decision issued” (since 18 Dec 2023).

See it on the live map All projects in Alipurduar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha is a road project in Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal. The site covers 0 acres.

Who is building it?

The applicant is Bharti Airtel Limited.

Has it been approved?

Yes. Its status is “Decision issued” (since 18 Dec 2023), as of 27 Nov 2026.

Where is it?

In Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal.

How big is it?

It has a stated cost of ₹3 lakh and a site of 0 acres.

When was it filed?

The application was filed on 18 Dec 2023.

Project details

Official titleProposal for the Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha.
StatusDecision issued
Status since18 Dec 2023
Application filed18 Dec 2023
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantBharti Airtel Limited
Land area200 m²
Project cost₹3 lakh
Village / localityUttar Barajhar Forest
Taluk / tehsilKalchini
DistrictAlipurduar
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-02445

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Oct 2024Lapsed0 acres₹3 lakh
New project filed 18 Dec 2023 (this page)Decision issued0 acres₹3 lakh

In context

8 applications in Alipurduar since January 2022 are in the same category (Roads & highways): 0 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharti Airtel Limited in Alipurduar

8 Bharti Airtel (Airtel) projects in Alipurduar
All 485 Bharti Airtel (Airtel) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.