Quick answers
What is 4g Saturation Project in Uncovered Village 20th Mile?
4g Saturation Project in Uncovered Village 20th Mile is a building project in Buxa Forest Panbarikhanda, Kalchini, Alipurduar, West Bengal. The site covers 0.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Decision issued” (since 30 Jun 2023), as of 27 Nov 2026.
Where is it?
In Buxa Forest Panbarikhanda, Kalchini, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹1 crore and a site of 0.2 acres.
When was it filed?
The application was filed on 30 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 4g Saturation Project in Uncovered Village 20th Mile
Project details
| Status | Decision issued |
|---|---|
| Status since | 30 Jun 2023 |
| Application filed | 30 Jun 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 1,000 m² |
| Project cost | ₹1 crore |
| Village / locality | Buxa Forest Panbarikhanda |
| Taluk / tehsil | Kalchini |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02435 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jul 2023 | Forest land use approved | 0.2 acres | ₹1 crore |
| New project filed 30 Jun 2023 (this page) | Decision issued | 0.2 acres | ₹1 crore |
In context
19 applications in Alipurduar since January 2022 are in the same category (Buildings & townships): 0 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 0.2 acres, this one is larger than 53% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Buxa Forest Panbarikhanda, Kalchini, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project in Uncovered Village 20th Mile — forest land use approved, 0 m away
- 4g Saturation Project in Uncovered Village 21st Mile — forest land use approved, 2.3 km away
- 4g Saturation Project in Uncovered Village 21st Mile — decision issued, 2.3 km away
- MIN_APD_22 Sand Mine — environmental approval granted, 2.7 km away
- Soda Aroma — more information requested, 11.9 km away
- Water Supply Scheme Buxa Forest PWSS (Z-II) Pampu Basty under JAL JEEVAN MISSION — forest land use approved, 12.3 km away
- Water Supply Scheme Buxa Forest PWSS (Z-II) Pampu Basty under JAL JEEVAN MISSION — decision issued, 12.3 km away
- BOP Bhutiabasti — under wildlife review, 12.4 km away
More from Mahesh Nair in Alipurduar
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Santlabari… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Lepchaka Camp (53 BN) — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.