Quick answers
What is 4g Saturation Project in Uncovered Village 21st Mile?
4g Saturation Project in Uncovered Village 21st Mile is a building project in Panbari, Alipurduar - Ii, Alipurduar, West Bengal. The site covers 0.3 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Decision issued” (since 26 Jun 2023), as of 27 Nov 2026.
Where is it?
In Panbari, Alipurduar - Ii, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹1 crore and a site of 0.3 acres.
When was it filed?
The application was filed on 26 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 4g Saturation Project in Uncovered Village 21st Mile
Project details
| Status | Decision issued |
|---|---|
| Status since | 26 Jun 2023 |
| Application filed | 26 Jun 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 1,400 m² |
| Project cost | ₹1 crore |
| Village / locality | Panbari |
| Taluk / tehsil | Alipurduar - Ii |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02389 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Jul 2023 | Forest land use approved | 0.3 acres | ₹1 crore |
| New project filed 26 Jun 2023 (this page) | Decision issued | 0.3 acres | ₹1 crore |
In context
19 applications in Alipurduar since January 2022 are in the same category (Buildings & townships): 0 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 0.3 acres, this one is larger than 68% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Panbari, Alipurduar - Ii, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project in Uncovered Village 21st Mile — forest land use approved, 0 m away
- 4g Saturation Project in Uncovered Village 20th Mile — forest land use approved, 2.3 km away
- 4g Saturation Project in Uncovered Village 20th Mile — decision issued, 2.3 km away
- MIN_APD_22 Sand Mine — environmental approval granted, 2.5 km away
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — under wildlife review, 10.3 km away
- BOP Jainti — decision issued, 10.3 km away
- 4G Saturation Project in uncovered village Sachapho Forest — lapsed, 10.7 km away
- BOP Bhutiabasti — under wildlife review, 10.7 km away
More from Mahesh Nair in Alipurduar
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Sankosh Camp_Outside… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Santlabari… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Bhutanghat… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Kalikhola BOP Camp… — decision issued
- Proposal for Tower construction under BOP/BIP Project at Lepchaka Camp (53 BN) — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.