Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 16 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹16.7 crore |
| Village / locality | Manglutan |
| Taluk / tehsil | Ferrargunj |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00086 |
In context
11 applications in South Andaman since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.7 acres, this one is larger than 82% of them.
Where it is
Manglutan, Ferrargunj, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Check Weir, Pump house, Pipeline & 01 No. CWR (2.45 Lakh) at Shoalbay-14 under… — in-principle approval, conditions pending, 7.1 km away
- Check Weir, Pump house and pipeline & 01 No. CWR (2.45 Lakh) at Shoal Bay-11… — in-principle approval, conditions pending, 7.4 km away
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — forest land use approved, 7.8 km away
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — lapsed, 7.8 km away
- Diversion of forest land for laying of Optical Fibre Cable from Ferrargunj… — forest land use approved, 11.8 km away
- Diversion of Forest Land for Laying of Ofc Cable Jirkatang Check Post to… — forest land use approved, 14 km away
- 60MW Floating Solar Photovoltaic (PV) Power Plant — under coastal review, 18 km away
- 04-Lane Major Bridge for Connectivity of Sri Vijaya Puram (Earlier Known As… — lapsed, 20.9 km away
More from Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle in South Andaman
- Installation of One 4G Tower in South Andaman under USOF Project — forest land use approved
- Diversion of forest land for laying of Optical Fibre Cable from Ferrargunj… — forest land use approved
- Diversion of Forest Land for Laying of Ofc Cable Jirkatang Check Post to… — forest land use approved
- Installation of One 4g Tower in South Andaman — forest land use approved
- 4G Mobile Tower Installation for Uncovered Villages in Little Andaman Division — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.