Project details
| Official title | Proposal for Diversion of Forest Land for Laying of Ofc Cable Jirkatang Check Post to Middle Strait Under South Andaman Forest Division |
|---|---|
| Status | Forest land use approved |
| Status since | 9 Feb 2024 |
| Application filed | 6 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle |
| Land area | 3.5 acres (1.4 ha) |
| Forest land | 3.5 acres (1.4 ha) |
| Project cost | ₹47 lakh |
| Village / locality | Jirkatang |
| Taluk / tehsil | Ferrargunj |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00093 |
In context
11 applications in South Andaman since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.5 acres, this one is larger than 91% of them.
Where it is
Jirkatang, Ferrargunj, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Installation of One 4G Tower in South Andaman under USOF Project — forest land use approved, 11 km away
- Installation of 4G Tower in South Andaman under USOF Project — lapsed, 14 km away
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — forest land use approved, 15.9 km away
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — lapsed, 15.9 km away
- Check Weir, Pump house, Pipeline & 01 No. CWR (2.45 Lakh) at Shoalbay-14 under… — in-principle approval, conditions pending, 17.4 km away
- 4g SATURATION PROJECT IN ANDAMAN AND NICOBAR- OFC LAYING — lapsed, 18.1 km away
- Check Weir, Pump house and pipeline & 01 No. CWR (2.45 Lakh) at Shoal Bay-11… — in-principle approval, conditions pending, 18.7 km away
- Diversion of forest land for laying of Optical Fibre Cable from Ferrargunj… — forest land use approved, 25.7 km away
More from Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle in South Andaman
- Installation of One 4G Tower in South Andaman under USOF Project — forest land use approved
- Diversion of forest land for laying of Optical Fibre Cable from Ferrargunj… — forest land use approved
- Installation of One 4g Tower in South Andaman — forest land use approved
- 4G Mobile Tower Installation for Uncovered Villages in Little Andaman Division — initial checks
- Installation of 4G Tower in South Andaman under USOF Project — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.