Project details
| Status | Forest land use approved |
|---|---|
| Status since | 9 Oct 2024 |
| Application filed | 1 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle |
| Land area | 400 m² |
| Forest land | 420 m² |
| Project cost | ₹1 crore |
| Village / locality | Jirkatang Camp No. 7 (Fc) |
| Taluk / tehsil | Ferrargunj |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00091 |
In context
11 applications in South Andaman since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.1 acres, this one is smaller than 73% of them.
Where it is
Jirkatang Camp No. 7 (Fc), Ferrargunj, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g SATURATION PROJECT IN ANDAMAN AND NICOBAR- OFC LAYING — lapsed, 7.3 km away
- Diversion of Forest Land for Laying of Ofc Cable Jirkatang Check Post to… — forest land use approved, 11 km away
- Installation of 4G Tower in South Andaman under USOF Project — lapsed, 24.9 km away
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — forest land use approved, 25.8 km away
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — lapsed, 25.8 km away
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — coastal clearance granted, 26.9 km away
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — in-principle approval, conditions pending, 26.9 km away
- Erection of 40 M Tower Under 4g Saturation Project by Goi at Elephanata Beach,… — lapsed, 26.9 km away
More from Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle in South Andaman
- Diversion of forest land for laying of Optical Fibre Cable from Ferrargunj… — forest land use approved
- Diversion of Forest Land for Laying of Ofc Cable Jirkatang Check Post to… — forest land use approved
- Installation of One 4g Tower in South Andaman — forest land use approved
- 4G Mobile Tower Installation for Uncovered Villages in Little Andaman Division — initial checks
- Installation of 4G Tower in South Andaman under USOF Project — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.