Quick answers
What is NTPC Talaipalli Coal Mining Project?
NTPC Talaipalli Coal Mining Project is a proposed mining project in Bichhinar, Gharghoda, Raigarh, Chhattisgarh. The site covers 5,237.1 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Bichhinar, Gharghoda, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹1,882.8 crore and a site of 5,237.1 acres.
When was it filed?
The application was filed on 14 Feb 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 15 Mar 2024 |
| Application filed | 14 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | NTPC Limited (NTPC) |
| Land area | 5,237.1 acres (2,119.4 ha) |
| Project cost | ₹1,882.8 crore |
| Village / locality | Bichhinar |
| Taluk / tehsil | Gharghoda |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00160 |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 5,237.1 acres, this one is larger than 95% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 20,916.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Bichhinar, Gharghoda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to South Eastern Coalfields Plans a 15-Million-Tonne-a-Year Coal Mine Expansion in Raigarh, Chhattisgarh (12.2 km away).
Other projects nearby
- Talaipalli Coal Mining Projects — environmental approval granted, 150 m away
- Talaipalli Coal Mining Project — returned to applicant, 150 m away
- Talaipalli Coal Mining Projects — withdrawn, 150 m away
- Talaipalli Coal Mining Projects — lapsed, 150 m away
- Talaipalli Coal Mining Projects — in-principle approval, conditions pending, 150 m away
- Talaipalli Coal Mining Projects — environmental approval granted, 150 m away
- Expansion by Up to 20% of the Existing Capacity of the Talaipalli Coal Mining… — under environmental review, 150 m away
- Phutamura Coal Block — forest land use approved, 6.4 km away
More from NTPC Limited (NTPC) in Raigarh
- Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW)… — more information requested
- NTPC Limited Lara Super Thermal Power Station, Raigarh, Chhattisgarh — under forest review
- 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at… — environmental approval granted
- Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW)… — cleared for impact study
- 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at… — returned to applicant
- 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at… — environmental approval granted
16 NTPC projects in Raigarh
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.