Quick answers
What is this project?
2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages Armuda, Chhapora, Bodajharia, Devalpura, Mahloi, Riyapalli, Lara, Jhilgitar and Kandagarh by M/s NTPC Ltd is an approved power project in Admunda, Pusour, Raigarh, Chhattisgarh. The site covers 3,034.2 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Jan 2026), as of 27 Nov 2026.
Where is it?
In Admunda, Pusour, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹33,399.4 crore and a site of 3,034.2 acres.
When was it filed?
The application was filed on 19 Nov 2025.
Project details
| Official title | 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages Armuda, Chhapora, Bodajharia, Devalpura, Mahloi, Riyapalli, Lara, Jhilgitar and Kandagarh, in Taluk Pussore, in District Raigarh, in Chhattisgarh by M/s NTPC Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Jan 2026 |
| Application filed | 19 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | NTPC Limited (NTPC) |
| Land area | 3,034.2 acres (1,227.9 ha) |
| Project cost | ₹33,399.4 crore |
| Village / locality | Admunda |
| Taluk / tehsil | Pusour |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02414 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 19 Nov 2025 (this page) | Environmental approval granted | 3,034.2 acres | ₹33,399.4 crore |
| Amendment filed 17 Oct 2023 | Returned to applicant | 1,373.5 acres | ₹31,779.5 crore |
| Expansion filed 7 May 2023 | Environmental approval granted | 1,373.5 acres | ₹31,779.5 crore |
In context
29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3,034.2 acres, this one is larger than 82% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Admunda, Pusour, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW)… — more information requested, 0 m away
- Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW)… — cleared for impact study, 0 m away
- NTPC Limited Lara Super Thermal Power Station, Raigarh, Chhattisgarh — under forest review, 350 m away
- 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at… — returned to applicant, 1.7 km away
- 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at… — environmental approval granted, 1.7 km away
- Mining project by M/s Saurya Minerals Pvt.Ltd — environmental approval granted, 5.8 km away
- Chhotehaldi Limestone Quarry — lapsed, 6 km away
- Shri Radhamadhav Crusher Udyog, Proprietor - Mithilesh Kumar Agrawal — lapsed, 6.3 km away
More from NTPC Limited (NTPC) in Raigarh
- Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW)… — more information requested
- NTPC Limited Lara Super Thermal Power Station, Raigarh, Chhattisgarh — under forest review
- Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW)… — cleared for impact study
- NTPC Talaipalli Coal Mining Project — returned to applicant
16 NTPC projects in Raigarh
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.