More information requestedPower · Raigarh, Chhattisgarh

Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) & Stage-II (2x800 MW)] to 4800 MW by adding two units of 800 MW under Lara Super Thermal Power Project, Stage-III (2x800 MW) at Villages Armuda, Chhapora, Bodajhariya, Mahloi, Riyapalli, Kandagarh. Devalpura, Ghutkupali, Thengapali, Lara by NTPC

Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) & Stage-II (2x800 MW)] to 4800 MW by adding two units of 800 MW under Lara Super Thermal Power Project, Stage-III (2x800 MW) at Villages Armuda, Chhapora, Bodajhariya, Mahloi, Riyapalli, Kandagarh. Devalpura, Ghutkupali, Thengapali, Lara by NTPC is a proposed power project in Ghutkupali, Pusour, Raigarh, Chhattisgarh. The site covers 3,135.2 acres. Its stated project cost is ₹53,899.4 crore. As of 27 Nov 2026, its status is “More information requested” (since 18 Nov 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) & Stage-II (2x800 MW)] to 4800 MW by adding two units of 800 MW under Lara Super Thermal Power Project, Stage-III (2x800 MW) at Villages Armuda, Chhapora, Bodajhariya, Mahloi, Riyapalli, Kandagarh. Devalpura, Ghutkupali, Thengapali, Lara by NTPC is a proposed power project in Ghutkupali, Pusour, Raigarh, Chhattisgarh. The site covers 3,135.2 acres.

Who is building it?

The applicant is NTPC Limited (NTPC).

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Ghutkupali, Pusour, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹53,899.4 crore and a site of 3,135.2 acres.

When was it filed?

The application was filed on 28 Sept 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) &…

Project details

Official titleExpansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) & Stage-II (2x800 MW)] to 4800 MW by adding two units of 800 MW under Lara Super Thermal Power Project, Stage-III (2x800 MW) at Villages Armuda, Chhapora, Bodajhariya, Mahloi, Riyapalli, Kandagarh. Devalpura, Ghutkupali, Thengapali, Lara in Tehsil Pussore, District Raigarh and Village Saradih in Tehsil Dabhara, District Sakti, Chhattisgarh.
StatusMore information requested
Status since18 Nov 2026
Application filed28 Sept 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorPower
ApplicantNTPC Limited (NTPC)
Land area3,135.2 acres (1,268.8 ha)
Project cost₹53,899.4 crore
Village / localityGhutkupali
Taluk / tehsilPusour
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03524

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Sept 2026 (this page)More information requested3,135.2 acres₹53,899.4 crore
Early planning filed 18 Jul 2025Cleared for impact study3,135.2 acres₹53,899.4 crore

In context

29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3,135.2 acres, this one is larger than 86% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ghutkupali, Pusour, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from NTPC Limited (NTPC) in Raigarh

16 NTPC projects in Raigarh
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.