Greenfield Project of 150 KLD Grain Based Ethanol Plant by M/s B R Refinery LLP is an approved industrial project in Natwarpur, Raigarh, Chhattisgarh. The site covers 13.6 acres.
Who is building it?
The applicant is B R Refinery LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Mar 2023), as of 27 Nov 2026.
Where is it?
In Natwarpur, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹198 crore and a site of 13.6 acres.
When was it filed?
The application was filed on 3 Mar 2023.
Project details
| Official title | Greenfield Project of 150 KLD Grain Based Ethanol Plant along with 4.5 MW Co-generation Power Plant at Khasra No. 239/1, 239/2 KHA Village-Natwarpur, Tehsil & District-Raigarh, Chhattisgarh by M/s B R Refinery LLP |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Mar 2023 |
| Application filed | 3 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | B R Refinery LLP |
| Land area | 13.6 acres (5.5 ha) |
| Project cost | ₹198 crore |
| Village / locality | Natwarpur |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00274 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 13.6 acres, this one is smaller than 81% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Natwarpur, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brownfield project for expansion in DRI based Steel plant to produce Sponge… — cleared for impact study, 500 m away
- Coal Tar Distillation plant to manufacture 18,000 TPA Coal tar Pitch and its… — cleared for impact study, 3.8 km away
- Coal Tar Distillation plant to manufacture 18,000 TPA Coal tar Pitch and its… — cleared for impact study, 3.8 km away
- Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD.… — under environmental review, 7.9 km away
- Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD.… — cleared for impact study, 7.9 km away
- Environmental Clearance for establishment steel plant comprising of I/O… — cleared for impact study, 7.9 km away
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks, 8.7 km away
- No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA… — initial checks, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.