LapsedIndustry · Raipur, Chhattisgarh

Expansion of Integrated Steel plant-Sponge Iron Plant-0.6 MTPA,Power Plant-125 MW(WHRB -3 X 16 MW,Blast urnace-10 MW,Coke Oven-25 MW,AFBC-42 MW),Hot Re-Rolling Mill- 0.40 MTPA, Pellet Plant-1.40 MTPA, Coal Gasifier-3X17000 Nm3/Hr, Iron Ore beneficiation Plant-2.0 MTPA, Ferro Alloys Plant-36000 TPA,Steel Melting Shop-1.0 MTPA, Coal Washery - 2.4 MTPA, Coke Oven Battery - 0.5 MTPA, Sintering Plant - 0.7 MTPA, Blast Furnace - 0.55 MTPA, Oxygen Plant - 500 TPD, Fly Ash Bricks Plant - 100,00,000 NPA

Expansion of Integrated Steel plant-Sponge Iron Plant-0.6 MTPA,Power Plant-125 MW(WHRB -3 X 16 MW,Blast urnace-10 MW,Coke Oven-25 MW,AFBC-42 MW),Hot Re-Rolling Mill- 0.40 MTPA, Pellet Plant-1.40 MTPA, Coal Gasifier-3X17000 Nm3/Hr, Iron Ore beneficiation Plant-2.0 MTPA, Ferro Alloys Plant-36000 TPA,Steel Melting Shop-1.0 MTPA, Coal Washery - 2.4 MTPA, Coke Oven Battery - 0.5 MTPA, Sintering Plant - 0.7 MTPA, Blast Furnace - 0.55 MTPA, Oxygen Plant - 500 TPD, Fly Ash Bricks Plant - 100,00,000 NPA is a lapsed industrial project in Kundru, Tilda, Raipur, Chhattisgarh. The site covers 348.9 acres. Its stated project cost is ₹1,500 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Integrated Steel plant-Sponge Iron Plant-0.6 MTPA,Power Plant-125 MW(WHRB -3 X 16 MW,Blast urnace-10 MW,Coke Oven-25 MW,AFBC-42 MW),Hot Re-Rolling Mill- 0.40 MTPA, Pellet Plant-1.40 MTPA, Coal Gasifier-3X17000 Nm3/Hr, Iron Ore beneficiation Plant-2.0 MTPA, Ferro Alloys Plant-36000 TPA,Steel Melting Shop-1.0 MTPA, Coal Washery - 2.4 MTPA, Coke Oven Battery - 0.5 MTPA, Sintering Plant - 0.7 MTPA, Blast Furnace - 0.55 MTPA, Oxygen Plant - 500 TPD, Fly Ash Bricks Plant - 100,00,000 NPA is a lapsed industrial project in Kundru, Tilda, Raipur, Chhattisgarh. The site covers 348.9 acres.

Who is building it?

The applicant is Shri Bajrang Power and Ispat Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Kundru, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹1,500 crore and a site of 348.9 acres.

When was it filed?

The application was filed on 21 May 2023.

Project details

StatusLapsed
Status since29 Oct 2024
Application filed21 May 2023
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantShri Bajrang Power and Ispat Limited
Land area348.9 acres (141.2 ha)
Project cost₹1,500 crore
Village / localityKundru
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00352

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 348.9 acres, this one is larger than 97% of them.

26 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kundru, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.