Quick answers
What is this project?
Expansion of Integrated Steel plant-Sponge Iron Plant-0.6 MTPA,Power Plant-125 MW(WHRB -3 X 16 MW,Blast urnace-10 MW,Coke Oven-25 MW,AFBC-42 MW),Hot Re-Rolling Mill- 0.40 MTPA, Pellet Plant-1.40 MTPA, Coal Gasifier-3X17000 Nm3/Hr, Iron Ore beneficiation Plant-2.0 MTPA, Ferro Alloys Plant-36000 TPA,Steel Melting Shop-1.0 MTPA, Coal Washery - 2.4 MTPA, Coke Oven Battery - 0.5 MTPA, Sintering Plant - 0.7 MTPA, Blast Furnace - 0.55 MTPA, Oxygen Plant - 500 TPD, Fly Ash Bricks Plant - 100,00,000 NPA is a lapsed industrial project in Kundru, Tilda, Raipur, Chhattisgarh. The site covers 348.9 acres.
Who is building it?
The applicant is Shri Bajrang Power and Ispat Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Kundru, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹1,500 crore and a site of 348.9 acres.
When was it filed?
The application was filed on 21 May 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 21 May 2023 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Shri Bajrang Power and Ispat Limited |
| Land area | 348.9 acres (141.2 ha) |
| Project cost | ₹1,500 crore |
| Village / locality | Kundru |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00352 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 348.9 acres, this one is larger than 97% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kundru, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing integrated Steel Plant -DRI Kilns(Sponge Iron 0.6 MTPA… — environmental approval granted, 0 m away
- Expansion of existing integrated Steel Plant -DRI Kilns(Sponge Iron 0.6 MTPA… — cleared for impact study, 0 m away
- Transfer of Environment Clearance vide no. IA-J-11011/88/2023-IA-II(IND-I) dt.… — environmental approval granted, 3 km away
- Proposed Change in the DRI plant configuration from 2 x 200 TPD Kilns to 1 x… — initial checks, 3 km away
- Greenfield Steel plant comprising of Establishment of DRI Kilns (Sponge Iron –… — environmental approval granted, 3 km away
- Greenfield Steel plant comprising of Establishment of DRI Kilns (Sponge Iron –… — cleared for impact study, 3 km away
- EC – Corrigendum for correction in lease area in EC Name change letter No.… — environmental approval granted, 3 km away
- Proposed Change in the DRI plant configuration from 3 x 100 TPD Kilns to 1 x… — initial checks, 3.2 km away
More from Shri Bajrang Power and Ispat Limited in Raipur
- Request for Corrigendum in Environmental Clearance Issued by Seiaa,… — under environmental review
- Transfer of Environmental Clearance (EC) issued to Bajrang Metallics & Power… — environmental approval granted
- Product-mix change (Existing MS Round Bars & CTD Bars to MS Round Bars & TMT… — initial checks
- Expansion of existing integrated Steel Plant -DRI Kilns(Sponge Iron 0.6 MTPA… — environmental approval granted
- Expansion of existing integrated Steel Plant -DRI Kilns(Sponge Iron 0.6 MTPA… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.