Quick answers
What is this project?
EC – Corrigendum for correction in lease area in EC Name change letter No. 3041/S.E.I.A.A, C.G/ Nava Raipur Atal Nagar dated 20/02/2024 from 273.003 Ha & 237.07 to 237.003 Ha as of Century Cement Limestone Mines, M/s UltraTech Cement Limited, (Unit: Baikunth Cement Works) Village- Bahesar & Tandwa Tahsil- Tilda, District-Raipur, (C.G.) is an approved mining project in Bahesar, Tilda, Raipur, Chhattisgarh. The site covers 585.6 acres.
Who is building it?
The applicant is UltraTech Cement Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Dec 2024), as of 27 Nov 2026.
Where is it?
In Bahesar, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹366.8 crore and a site of 585.6 acres.
When was it filed?
The application was filed on 17 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Dec 2024 |
| Application filed | 17 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 585.6 acres (237 ha) |
| Project cost | ₹366.8 crore |
| Village / locality | Bahesar |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01397 |
In context
273 applications in Raipur since January 2022 are in the same category (Mining): 123 approved, 21 filed or under review, and 129 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 585.6 acres, this one is larger than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bahesar, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- For proposed "Change in the DRI plant configuration from 2x500 TPD DRI Kilns… — initial checks, 1.8 km away
- Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) – 3,30,000 TPA,… — lapsed, 1.8 km away
- Request for Amendment to the Environmental Clearance (Ec) to Permit the… — environmental approval granted, 1.8 km away
- Speciality Chemical Manufacturing Unit — cleared for impact study, 1.9 km away
- Proposed Change in the DRI plant configuration from 3 x 100 TPD Kilns to 1 x… — initial checks, 2.4 km away
- Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA),… — environmental approval granted, 2.4 km away
- Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA),… — cleared for impact study, 2.4 km away
- Transfer of Environment Clearance vide no. IA-J-11011/88/2023-IA-II(IND-I) dt.… — environmental approval granted, 2.6 km away
More from UltraTech Cement Limited in Raipur
- Kesla Limestone Mine (Auction Block) (ML Area: 108.335 ha) located at… — environmental approval granted
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.