What is Developing? Open the mapMap

LapsedIndustry · Raipur, Chhattisgarh

Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA to75,000 TPA (by use of Pellets & High-Grade Coal), Induction Furnace Capacity from 50,000 TPA to 2,60,900 TPA, Rolling Mill Capacity from 50,000 TPA to 2,64,000 TPA, WHRB Power Plant from 4.0 MW to 6.0 MW, New Pellet Plant of 0.4 MTPA and Fly Ash Brick Plant of 22,000 Nos. Bricks /day

Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA to75,000 TPA (by use of Pellets & High-Grade Coal), Induction Furnace Capacity from 50,000 TPA to 2,60,900 TPA, Rolling Mill Capacity from 50,000 TPA to 2,64,000 TPA, WHRB Power Plant from 4.0 MW to 6.0 MW, New Pellet Plant of 0.4 MTPA and Fly Ash Brick Plant of 22,000 Nos. Bricks /day is a lapsed industrial project in Sondra, Raipur, Chhattisgarh. The site covers 42.9 acres. Its stated project cost is ₹1.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA to75,000 TPA (by use of Pellets & High-Grade Coal), Induction Furnace Capacity from 50,000 TPA to 2,60,900 TPA, Rolling Mill Capacity from 50,000 TPA to 2,64,000 TPA, WHRB Power Plant from 4.0 MW to 6.0 MW, New Pellet Plant of 0.4 MTPA and Fly Ash Brick Plant of 22,000 Nos. Bricks /day is a lapsed industrial project in Sondra, Raipur, Chhattisgarh. The site covers 42.9 acres.

Who is building it?

The applicant is Mahendra Sponge and Power Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Sondra, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹1.6 crore and a site of 42.9 acres.

When was it filed?

The application was filed on 22 Aug 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA to75,000…

Project details

StatusLapsed
Status since29 Oct 2024
Application filed22 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMahendra Sponge and Power Limited
Land area42.9 acres (17.4 ha)
Project cost₹1.6 crore
Village / localitySondra
Taluk / tehsilRaipur
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01189

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 14 Nov 2024Environmental approval granted42.9 acres₹1.6 crore
Early planning filed 22 Aug 2024 (this page)Lapsed42.9 acres₹1.6 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 42.9 acres, this one is larger than 62% of them.

64 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sondra, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Mahendra Sponge and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.