Quick answers
What is this project?
Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA to75,000 TPA (by use of Pellets & High-Grade Coal), Induction Furnace Capacity from 50,000 TPA to 2,60,900 TPA, Rolling Mill Capacity from 50,000 TPA to 2,64,000 TPA, WHRB Power Plant from 4.0 MW to 6.0 MW, New Pellet Plant of 0.4 MTPA and Fly Ash Brick Plant of 22,000 Nos. Bricks /day is an approved industrial project in Sondra, Raipur, Chhattisgarh. The site covers 42.9 acres.
Who is building it?
The applicant is Mahendra Sponge and Power Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Jan 2025), as of 27 Nov 2026.
Where is it?
In Sondra, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 42.9 acres.
When was it filed?
The application was filed on 14 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Jan 2025 |
| Application filed | 14 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Mahendra Sponge and Power Limited |
| Land area | 42.9 acres (17.4 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Sondra |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02327 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 Nov 2024 (this page) | Environmental approval granted | 42.9 acres | ₹1.6 crore |
| Early planning filed 22 Aug 2024 | Lapsed | 42.9 acres | ₹1.6 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 42.9 acres, this one is larger than 62% of them.
64 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sondra, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA… — lapsed, 0 m away
- Expansion of Existing Production Unit (Under Para 7(II) (a) as per EIA… — lapsed, 600 m away
- Expansion Of Sponge Iron Production And Whrb Power Without Increase In… — initial checks, 600 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — withdrawn, 600 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — environmental approval granted, 600 m away
- Expansion of Steel Plant–DRI Kilns(Sponge Iron- 66,000 to 86,940 TPA &… — cleared for impact study, 750 m away
- Transfer of Environmental Clearance from Gagan Resources Private Limited to… — environmental approval granted, 750 m away
- Transfer of EC from M/s. Saini Industries Limited to M/s. Gagan Resources… — environmental approval granted, 750 m away
All 3 Mahendra Sponge and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.