Quick answers
What is this project?
Request for Amendment to the Environmental Clearance (Ec) to Permit the Utilization of Harvested Rainwater From the Proposed 6-Acre Water Reservoir Located on Land Adjoining the Ec-Approved Area, Instead of Surface Water for Phase-I and Phase-Ii Operations of Shaurya Ispat Udyog Private Limited is an approved industrial project in Bahesar, Tilda, Raipur, Chhattisgarh. The site covers 30.5 acres.
Who is building it?
The applicant is Shaurya Ispat Udyog Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Jun 2026), as of 27 Nov 2026.
Where is it?
In Bahesar, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹400 crore and a site of 30.5 acres.
When was it filed?
The application was filed on 18 Apr 2026.
Project details
| Official title | Request for Amendment to the Environmental Clearance (Ec) to Permit the Utilization of Harvested Rainwater From the Proposed 6-Acre Water Reservoir Located on Land Adjoining the Ec-Approved Area, Instead of Surface Water for Phase-I and Phase-Ii Operations of Shaurya Ispat Udyog Private Limited Situated at Bahesar Village, Tilda Tehsil, Raipur District, Chhattisgarh |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Jun 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Shaurya Ispat Udyog Private Limited |
| Land area | 30.5 acres (12.4 ha) |
| Project cost | ₹400 crore |
| Village / locality | Bahesar |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03051 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30.5 acres, this one is larger than 54% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bahesar, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- For proposed "Change in the DRI plant configuration from 2x500 TPD DRI Kilns… — initial checks, 150 m away
- Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) – 3,30,000 TPA,… — lapsed, 150 m away
- Speciality Chemical Manufacturing Unit — cleared for impact study, 850 m away
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — environmental approval granted, 1.5 km away
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — cleared for impact study, 1.5 km away
- EC – Corrigendum for correction in lease area in EC Name change letter No.… — environmental approval granted, 1.8 km away
- Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance… — cleared for impact study, 2 km away
- Proposed Change in the DRI plant configuration from 3 x 100 TPD Kilns to 1 x… — initial checks, 2 km away
More from Shaurya Ispat Udyog Private Limited in Raipur
- For proposed "Change in the DRI plant configuration from 2x500 TPD DRI Kilns… — initial checks
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — environmental approval granted
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — cleared for impact study
- Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) – 3,30,000 TPA,… — lapsed
All 6 Shaurya Ispat Udyog projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.