Quick answers
What is this project?
Greenfield Steel Plant Comprising of Pellet Plant1x2,000tpd–6,60,000tpa is a proposed industrial project in Sankar, Tilda, Raipur, Chhattisgarh. The site covers 185.9 acres.
Who is building it?
The applicant is Shree Nakoda Ispat and Power Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Nov 2024), as of 27 Nov 2026.
Where is it?
In Sankar, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹683.8 crore and a site of 185.9 acres.
When was it filed?
The application was filed on 21 Aug 2024.
Project details
| Official title | Establishment of Greenfield Steel Plant Comprising of Pellet Plant1x2,000tpd–6,60,000tpa, Along With Producer Gas Plant for Pellet Plant-1x20,000nm3/Hr,dri Kilns2x350tpd-2,31,000tpa, Induction Furnaces With Matching Lrf&ccm(Hot Billets/Billets/Ingots)2x30t-1,98,000tpa,rolling Mills(Tmt Bars/Structural Steel)(85%hot Charging With Hot Billets and Remaining15%through Rhf With Coal Gasifier As Fuel–1,98,000tpa,along With Coal Gasifier for Reheating Furnace-1x6,000nm3/Hr,galvanizing Plant Pipe Unit3 |
|---|---|
| Status | Cleared for impact study |
| Status since | 18 Nov 2024 |
| Application filed | 21 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shree Nakoda Ispat and Power Private Limited |
| Land area | 185.9 acres (75.2 ha) |
| Project cost | ₹683.8 crore |
| Village / locality | Sankar |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01502 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Oct 2026 | Under environmental review | 201.3 acres | ₹683.8 crore |
| Early planning filed 21 Aug 2024 (this page) | Cleared for impact study | 185.9 acres | ₹683.8 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 185.9 acres, this one is larger than 90% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sankar, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance (EC) from M/s. Shyam Steel Industries to… — under environmental review, 4.1 km away
- Expansion of Billets from 30,000 TPA to 1,89,000 TPA and Proposed Hot Charge… — environmental approval granted, 4.1 km away
- Expansion of Billets from 30,000 TPA to 1,89,000 TPA and Proposed Hot Charge… — returned to applicant, 4.1 km away
- "Expansion of Integrated Steel Plant" by M/s SKS Ispat and Power Limited — lapsed, 4.4 km away
- Transfer of Environmental clearance (EC) from M/s SKS Ispat Limited to M/s SKS… — under environmental review, 4.4 km away
- Expansion of Production Facilities of Induction Furnace With Ccm From Existing… — cleared for impact study, 4.4 km away
- Proposed Dyes and Dye Intermediate Manufacturing with production capacity of… — cleared for impact study, 5 km away
- Forward Integration of Existing 100 TPD Sponge Iron Project by Expansion of… — environmental approval granted, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.