What is Developing? Open the mapMap

Environmental approval grantedIndustry · Raipur, Chhattisgarh

Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657 MTPA, Iron Ore Pelletization Plant from 2.7 MTPA to 4.7 MTPA

Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657 MTPA, Iron Ore Pelletization Plant from 2.7 MTPA to 4.7 MTPA is an approved industrial project in Siltara, Raipur, Chhattisgarh. The site covers 291 acres. Its stated project cost is ₹2,742.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Apr 2025).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657 MTPA, Iron Ore Pelletization Plant from 2.7 MTPA to 4.7 MTPA is an approved industrial project in Siltara, Raipur, Chhattisgarh. The site covers 291 acres.

Who is building it?

The applicant is Godawari Power and Ispat Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Apr 2025), as of 27 Nov 2026.

Where is it?

In Siltara, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹2,742.1 crore and a site of 291 acres.

When was it filed?

The application was filed on 28 Jan 2025.

Project details

Official titleExpansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657 MTPA, Iron Ore Pelletization Plant from 2.7 MTPA to 4.7 MTPA along with Coal Gasification Plant 92000 Nm3/hr to 151500 Nm3/hr and Mineral Grinding Plant from 0.2 MTPA to 0.4 MTPA for manufacturing of Magnetite Powder within existing facilities.
StatusEnvironmental approval granted
Status since10 Apr 2025
Application filed28 Jan 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantGodawari Power and Ispat Limited
Land area291 acres (117.8 ha)
Project cost₹2,742.1 crore
Village / localitySiltara
Taluk / tehsilRaipur
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02922

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 28 Jan 2025 (this page)Environmental approval granted291 acres₹2,742.1 crore
Expansion filed 30 Nov 2023Environmental approval granted278 acres₹2,591.9 crore
Early planning filed 5 May 2023Cleared for impact study278 acres₹2,591.9 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 291 acres, this one is larger than 95% of them.

47 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Siltara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Godawari Power and Ispat Limited in Raipur

6 Godawari Power and Ispat projects in Raipur
All 13 Godawari Power and Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.