Enhancement in production of Sponge Iron from 650000 TPA to 715000 TPA through process optimization within existing Plant and Machinery & with "No Increase in Pollution Load" for Godawari Power and Ispat Ltd at Plot No. 428/2, and other Phase-1, Industrial Area Village Siltara and Tanda, Tahsil Dharsiwa, District Raipur, Chhattisgarh.

Enhancement in production of Sponge Iron from 650000 TPA to 715000 TPA through process optimization within existing Plant and Machinery & with "No Increase in Pollution Load" for Godawari Power and Ispat Ltd at Plot No. 428/2, and other Phase-1, Industrial Area Village Siltara and Tanda, Tahsil Dharsiwa, District Raipur, Chhattisgarh is a proposed industrial building project in Siltara, Raipur, Chhattisgarh. The site covers 277.9 acres. Its stated project cost is ₹2,695.3 crore. As of 27 Nov 2026, its status is “Initial checks” (since 22 Sept 2026).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Enhancement in production of Sponge Iron from 650000 TPA to 715000 TPA through process optimization within existing Plant and Machinery & with "No Increase in Pollution Load" for Godawari Power and Ispat Ltd at Plot No. 428/2, and other Phase-1, Industrial Area Village Siltara and Tanda, Tahsil Dharsiwa, District Raipur, Chhattisgarh is a proposed industrial building project in Siltara, Raipur, Chhattisgarh. The site covers 277.9 acres.

Who is building it?

The applicant is Godawari Power and Ispat Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Siltara, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹2,695.3 crore and a site of 277.9 acres.

When was it filed?

The application was filed on 22 Sept 2026.

Project details

StatusInitial checks
Status since22 Sept 2026
Application filed22 Sept 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantGodawari Power and Ispat Limited
UseIndustrial
Land area277.9 acres (112.5 ha)
Project cost₹2,695.3 crore
Village / localitySiltara
Taluk / tehsilRaipur
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03314

In context

56 applications in Raipur since January 2022 are in the same category (Buildings & townships): 29 approved, 18 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 277.9 acres, this one is larger than 96% of them.

49 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Siltara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Godawari Power and Ispat Limited in Raipur

6 Godawari Power and Ispat projects in Raipur
All 13 Godawari Power and Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.