Quick answers
What is this project?
Greenfield Steel plant of 2x350 TPD DRI Kilns to produce Sponge Iron of 245000TPA, IF of 4 x 25 Ton with 2 strand CCM to produce MS Billets of 343000 TPA, Rerolled Steel Products of 332710 TPA (Through Hot Charging & through RF based on Coal Gasifier is 80605 TPA, Galvanized Steel Plant (150000 TPA), Slag Crusher Unit (60 TPH), CPP of 35 MW (20 MW through WHRB & 15 MW through AFBC) , FlyAsh Bricks Plant 32500 Bricks/Day & Weighbridge Facility by M/s Tarni Steels LLP (Unit-2) is a proposed industrial project in Chataud, Tilda, Raipur, Chhattisgarh. The site covers 24.5 acres.
Who is building it?
The applicant is Tarni Steel LLP.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Aug 2026), as of 27 Nov 2026.
Where is it?
In Chataud, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹462 crore and a site of 24.5 acres.
When was it filed?
The application was filed on 20 Aug 2026.
Project details
| Official title | Establishment of Greenfield Steel plant of 2x350 TPD DRI Kilns to produce Sponge Iron of 245000TPA, IF of 4 x 25 Ton with 2 strand CCM to produce MS Billets of 343000 TPA, Rerolled Steel Products of 332710 TPA (Through Hot Charging & through RF based on Coal Gasifier is 80605 TPA, Galvanized Steel Plant (150000 TPA), Slag Crusher Unit (60 TPH), CPP of 35 MW (20 MW through WHRB & 15 MW through AFBC) , FlyAsh Bricks Plant 32500 Bricks/Day & Weighbridge Facility by M/s Tarni Steels LLP (Unit-2) |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Aug 2026 |
| Application filed | 20 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Tarni Steel LLP |
| Land area | 24.5 acres (9.9 ha) |
| Project cost | ₹462 crore |
| Village / locality | Chataud |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03736 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24.5 acres, this one is larger than 50% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chataud, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- DRI Kilns (Sponge Iron 2,31,000 TPA), Induction Furnace with LRF & CCM (MS… — cleared for impact study, 3.5 km away
- Greenfield project for implementation of DRI based Steel plant to produce… — lapsed, 3.9 km away
- Greenfield project for implementation of DRI based Steel plant to produce… — environmental approval granted, 3.9 km away
- For proposed "Change in the DRI plant configuration from 2x500 TPD DRI Kilns… — initial checks, 4.1 km away
- Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) – 3,30,000 TPA,… — lapsed, 4.1 km away
- Request for Amendment to the Environmental Clearance (Ec) to Permit the… — environmental approval granted, 4.1 km away
- Greenfield project for implementation of DRI based Steel plant to produce… — cleared for impact study, 4.2 km away
- DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS… — cleared for impact study, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.