Quick answers
What is Basudev Trade Link?
Basudev Trade Link is a proposed project in Rambor, Pathariya, Mungeli, Chhattisgarh. The site covers 29.5 acres.
Who is building it?
The applicant is Basudev Trade Link.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Rambor, Pathariya, Mungeli, Chhattisgarh.
How big is it?
It has a stated cost of ₹108.1 crore and a site of 29.5 acres.
When was it filed?
The application was filed on 23 Sept 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 23 Sept 2025 |
| Application filed | 23 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Basudev Trade Link |
| Land area | 29.5 acres (12 ha) |
| Project cost | ₹108.1 crore |
| Village / locality | Rambor |
| Taluk / tehsil | Pathariya |
| District | Mungeli |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02491 |
In context
13 applications in Mungeli since January 2022 are in the same category (Other): 4 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 29.5 acres, this one is larger than 92% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rambor, Pathariya, Mungeli, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — lapsed, 50 m away
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — withdrawn, 50 m away
- Transfer of Environmental Clearance (EC) from M/s Basudev Trade Link to M/s… — environmental approval granted, 50 m away
- Transfer of Environmental Clearance from M/s Radha Madhav Industries Private… — lapsed, 50 m away
- Transfer of Environmental Clearance (EC) from Real Power Private Limited to… — environmental approval granted, 550 m away
- Transfer of TOR letter for Establishment of 1 x 9 MVA Ferro Alloys plant… — lapsed, 550 m away
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — initial checks, 550 m away
- Change in configuration of the plant under provision of NIPL as per the EIA… — initial checks, 550 m away
More from Basudev Trade Link in Mungeli
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — withdrawn
- Transfer of Environmental Clearance from M/s Radha Madhav Industries Private… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.