Quick answers
What is this project?
Transfer of Environmental Clearance from M/s Radha Madhav Industries Private Limited to M/s Basudev Trade Link for production of Sponge Iron (1x100 TPD) – 30,000 TPA is a lapsed industrial project in Rambor, Pathariya, Mungeli, Chhattisgarh. The site covers 24.1 acres.
Who is building it?
The applicant is Basudev Trade Link.
Has it been approved?
No. The application was lapsed on 27 Aug 2026, so it is no longer under consideration.
Where is it?
In Rambor, Pathariya, Mungeli, Chhattisgarh.
How big is it?
It has a stated cost of ₹15.9 crore and a site of 24.1 acres.
When was it filed?
The application was filed on 13 Jan 2026.
Project details
| Official title | Transfer of Environmental Clearance from M/s Radha Madhav Industries Private Limited to M/s Basudev Trade Link for production of Sponge Iron (1x100 TPD) – 30,000 TPA at Village -Rambod, District-Mungeli (C.G) |
|---|---|
| Status | Lapsed |
| Status since | 27 Aug 2026 |
| Application filed | 13 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Basudev Trade Link |
| Land area | 24.1 acres (9.8 ha) |
| Project cost | ₹15.9 crore |
| Village / locality | Rambor |
| Taluk / tehsil | Pathariya |
| District | Mungeli |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03635 |
In context
16 applications in Mungeli since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.1 acres, this one is smaller than 81% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rambor, Pathariya, Mungeli, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — lapsed, 0 m away
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — withdrawn, 0 m away
- Transfer of Environmental Clearance (EC) from M/s Basudev Trade Link to M/s… — environmental approval granted, 0 m away
- Basudev Trade Link — initial checks, 50 m away
- Transfer of Environmental Clearance (EC) from Real Power Private Limited to… — environmental approval granted, 500 m away
- Transfer of TOR letter for Establishment of 1 x 9 MVA Ferro Alloys plant… — lapsed, 500 m away
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — initial checks, 500 m away
- Change in configuration of the plant under provision of NIPL as per the EIA… — initial checks, 500 m away
More from Basudev Trade Link in Mungeli
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — withdrawn
- Basudev Trade Link — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.