Quick answers
What is this project?
Pellet Plant (1.0 MTPA) with Upstream Slime Beneficiation facilitates at Iron Ore Complex (IOC) Dalli -Rajhara, District-Balod, Chhattisgarh of M/s Steel Authority of India Ltd (19ha) – Extension of validity of Environmental Clearance as per Para 9A of EIA notification 2006 is an approved mining project in Kondekasa, Dondi, Balod, Chhattisgarh. The site covers 46.9 acres.
Who is building it?
The applicant is Steel Authority of India LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Feb 2026), as of 27 Nov 2026.
Where is it?
In Kondekasa, Dondi, Balod, Chhattisgarh.
How big is it?
It has a stated cost of ₹441.4 crore and a site of 46.9 acres.
When was it filed?
The application was filed on 18 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Feb 2026 |
| Application filed | 18 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Steel Authority of India LTD |
| Land area | 46.9 acres (19 ha) |
| Project cost | ₹441.4 crore |
| Village / locality | Kondekasa |
| Taluk / tehsil | Dondi |
| District | Balod |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02667 |
In context
70 applications in Balod since January 2022 are in the same category (Mining): 23 approved, 16 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 46.9 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Kondekasa, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases… — under environmental review, 0 m away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — cleared for impact study, 2.6 km away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — lapsed, 2.6 km away
- Proposed Thakurtola Iron Ore Block over an area of 64.77 Ha — under environmental review, 3.7 km away
- Thakurtola Iron Ore Block- Bore Hole — forest land use approved, 3.7 km away
- Environment Clearance of Pandridalli & Rajhara Pahar Iron Ore Lease (ML Area… — environmental approval granted, 5.7 km away
- Greenfield project comprising of Iron ore Beneficiation Plant – 1.2 MTPA,… — environmental approval granted, 7.4 km away
- Preliminary Exploration Survey (G-3 Stage) for Iron Ore in the… — not approved, 8.3 km away
More from Steel Authority of India LTD in Balod
- Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases… — under environmental review
- Drilling of 62 Nos of Exploratory Bore Hole Upto 6" Diameter for Prospecting… — forest land use approved
- Environment Clearance of Pandridalli & Rajhara Pahar Iron Ore Lease (ML Area… — environmental approval granted
4 Steel Authority of India projects in Balod
All 51 Steel Authority of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.