What is Developing? Open the mapMap

Cleared for impact studyMining · Balod, Chhattisgarh

Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each by M/s. Satya Power and Ispat Limited

Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each by M/s. Satya Power and Ispat Limited is a proposed mining project in Hitkasa, Dondi, Balod, Chhattisgarh. The site covers 197.7 acres. Its stated project cost is ₹90 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Sept 2025).

See it on the live map All projects in Balod

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each by M/s. Satya Power and Ispat Limited is a proposed mining project in Hitkasa, Dondi, Balod, Chhattisgarh. The site covers 197.7 acres.

Who is building it?

The applicant is Satya Power &ispat Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Sept 2025), as of 27 Nov 2026.

Where is it?

In Hitkasa, Dondi, Balod, Chhattisgarh.

How big is it?

It has a stated cost of ₹90 crore and a site of 197.7 acres.

When was it filed?

The application was filed on 23 Mar 2024.

Project details

Official titleProposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each at Village - Hitkasa, Tehsil - Dondi, District - Balod, Chhattisgarh by M/s. Satya Power and Ispat Limited.
StatusCleared for impact study
Status since3 Sept 2025
Application filed23 Mar 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSatya Power &ispat Limited
Land area197.7 acres (80 ha)
Project cost₹90 crore
Village / localityHitkasa
Taluk / tehsilDondi
DistrictBalod
StateChhattisgarh
Location fromSite area on record
Our referenceWID-CG-01691

In context

70 applications in Balod since January 2022 are in the same category (Mining): 23 approved, 16 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 197.7 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Hitkasa, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Satya Power &ispat Limited in Balod

All 7 Satya Power &ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.