Quick answers
What is this project?
Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each by M/s. Satya Power and Ispat Limited is a proposed mining project in Hitkasa, Dondi, Balod, Chhattisgarh. The site covers 197.7 acres.
Who is building it?
The applicant is Satya Power &ispat Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Sept 2025), as of 27 Nov 2026.
Where is it?
In Hitkasa, Dondi, Balod, Chhattisgarh.
How big is it?
It has a stated cost of ₹90 crore and a site of 197.7 acres.
When was it filed?
The application was filed on 23 Mar 2024.
Project details
| Official title | Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each at Village - Hitkasa, Tehsil - Dondi, District - Balod, Chhattisgarh by M/s. Satya Power and Ispat Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 3 Sept 2025 |
| Application filed | 23 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Satya Power &ispat Limited |
| Land area | 197.7 acres (80 ha) |
| Project cost | ₹90 crore |
| Village / locality | Hitkasa |
| Taluk / tehsil | Dondi |
| District | Balod |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-01691 |
In context
70 applications in Balod since January 2022 are in the same category (Mining): 23 approved, 16 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 197.7 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Hitkasa, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — lapsed, 0 m away
- Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases… — under environmental review, 2.6 km away
- Pellet Plant (1.0 MTPA) with Upstream Slime Beneficiation facilitates at Iron… — environmental approval granted, 2.6 km away
- Thakurtola Iron Ore Block- Bore Hole — forest land use approved, 3.6 km away
- Proposed Thakurtola Iron Ore Block over an area of 64.77 Ha — under environmental review, 3.6 km away
- Dondi Iron Ore Block — more information requested, 7.4 km away
- Dondi Iron Ore Block — cleared for impact study, 7.4 km away
- Geeta Minerals — forest land use approved, 7.4 km away
More from Satya Power &ispat Limited in Balod
All 7 Satya Power &ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.