Quick answers
What is this project?
Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each by M/s. Satya Power and Ispat Limited is a lapsed mining project in Kondekasa, Dondi, Balod, Chhattisgarh. The site covers 197.7 acres.
Who is building it?
The applicant is Satya Power &ispat Limited.
Has it been approved?
No. The application was lapsed on 19 Oct 2026, so it is no longer under consideration.
Where is it?
In Kondekasa, Dondi, Balod, Chhattisgarh.
How big is it?
It has a stated cost of ₹90 crore and a site of 197.7 acres.
When was it filed?
The application was filed on 22 Dec 2025.
Project details
| Official title | Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore Production Capacity 1.0 Million TPA having two nos. Crushers with mobile screen, capacity 300 TPH each at Village - Hitkasa, Tehsil - Dondi, District - Balod, Chhattisgarh by M/s. Satya Power and Ispat Limited. |
|---|---|
| Status | Lapsed |
| Status since | 19 Oct 2026 |
| Application filed | 22 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Satya Power &ispat Limited |
| Land area | 197.7 acres (80 ha) |
| Project cost | ₹90 crore |
| Village / locality | Kondekasa |
| Taluk / tehsil | Dondi |
| District | Balod |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02804 |
In context
70 applications in Balod since January 2022 are in the same category (Mining): 23 approved, 16 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 197.7 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Kondekasa, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — cleared for impact study, 0 m away
- Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases… — under environmental review, 2.6 km away
- Pellet Plant (1.0 MTPA) with Upstream Slime Beneficiation facilitates at Iron… — environmental approval granted, 2.6 km away
- Thakurtola Iron Ore Block- Bore Hole — forest land use approved, 3.6 km away
- Proposed Thakurtola Iron Ore Block over an area of 64.77 Ha — under environmental review, 3.6 km away
- Dondi Iron Ore Block — more information requested, 7.4 km away
- Dondi Iron Ore Block — cleared for impact study, 7.4 km away
- Geeta Minerals — forest land use approved, 7.4 km away
More from Satya Power &ispat Limited in Balod
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — cleared for impact study
All 7 Satya Power &ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.