Quick answers
What is this project?
Greenfield project comprising of Iron ore Beneficiation Plant – 1.2 MTPA, Pelletization Plant - 0.9 MTPA is an approved industrial project in Gudum, Dondi, Balod, Chhattisgarh. The site covers 76.2 acres.
Who is building it?
The applicant is Mineral Dynamics Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Oct 2026), as of 27 Nov 2026.
Where is it?
In Gudum, Dondi, Balod, Chhattisgarh.
How big is it?
It has a stated cost of ₹340 crore and a site of 76.2 acres.
When was it filed?
The application was filed on 9 Sept 2026.
Project details
| Official title | Establishment of Greenfield project comprising of Iron ore Beneficiation Plant – 1.2 MTPA, Pelletization Plant - 0.9 MTPA along with Producer Gas Plant – 6 x 4000 Nm3/Hr., Submerged Electric Arc Furnace - 1 x 5 MVA (FeSi - 4,616 TPA / FeMn - 12,782 TPA / SiMn - 8,875 TPA / FeCr - 9,232 TPA/ Pig Iron - 16,329 TPA), Jigging unit – 2 TPH, Briquetting Plant - 55 Kg/Hr., Brick Manufacturing unit - 10,000 Bricks / Day |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Oct 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Mineral Dynamics Private Limited |
| Land area | 76.2 acres (30.8 ha) |
| Project cost | ₹340 crore |
| Village / locality | Gudum |
| Taluk / tehsil | Dondi |
| District | Balod |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03323 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Sept 2026 (this page) | Environmental approval granted | 76.2 acres | ₹340 crore |
| Early planning filed 20 Feb 2026 | Cleared for impact study | 98.1 acres | ₹340 crore |
In context
6 applications in Balod since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gudum, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Upgradation and Widening of Admabad-Ghotiya-Dondi Road 41.00 Km by Public Work… — lapsed, 4.8 km away
- Proposed Thakurtola Iron Ore Block over an area of 64.77 Ha — under environmental review, 4.9 km away
- Thakurtola Iron Ore Block- Bore Hole — forest land use approved, 5 km away
- Environment Clearance of Pandridalli & Rajhara Pahar Iron Ore Lease (ML Area… — environmental approval granted, 5.4 km away
- Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases… — under environmental review, 7.4 km away
- Pellet Plant (1.0 MTPA) with Upstream Slime Beneficiation facilitates at Iron… — environmental approval granted, 7.4 km away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — lapsed, 8.4 km away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — cleared for impact study, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.