Under environmental reviewMining · Balod, Chhattisgarh

Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases (Phase-I: 20% from 1.0 to 1.2 MTPA and Phase-II: 20% from 1.2 to 1.4 MTPA) Comprising of Pellet Plant (from 1.0 to 1.4 MTPA) with Congruent Upstream Slime Beneficiation Facilities (from 1.0 to 1.4 MTPA + New 0.6 MTPA) at Iron Ore Complex Dalli-Rajhera within existing Area of 19.0 Ha, Khasra No. 79, Village Kondekasa, Tehsil Dondi, District Balod, Chhattisgarh by M/s SAIL under 7(ii)(a) of the EIA Notification 2006

Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases (Phase-I: 20% from 1.0 to 1.2 MTPA and Phase-II: 20% from 1.2 to 1.4 MTPA) Comprising of Pellet Plant (from 1.0 to 1.4 MTPA) with Congruent Upstream Slime Beneficiation Facilities (from 1.0 to 1.4 MTPA + New 0.6 MTPA) at Iron Ore Complex Dalli-Rajhera within existing Area of 19.0 Ha, Khasra No. 79, Village Kondekasa, Tehsil Dondi, District Balod, Chhattisgarh by M/s SAIL under 7(ii)(a) of the EIA Notification 2006 is a proposed mining project in Kondekasa, Dondi, Balod, Chhattisgarh. The site covers 46.9 acres. Its stated project cost is ₹600 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 18 Nov 2026).

See it on the live map All projects in Balod

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases (Phase-I: 20% from 1.0 to 1.2 MTPA and Phase-II: 20% from 1.2 to 1.4 MTPA) Comprising of Pellet Plant (from 1.0 to 1.4 MTPA) with Congruent Upstream Slime Beneficiation Facilities (from 1.0 to 1.4 MTPA + New 0.6 MTPA) at Iron Ore Complex Dalli-Rajhera within existing Area of 19.0 Ha, Khasra No. 79, Village Kondekasa, Tehsil Dondi, District Balod, Chhattisgarh by M/s SAIL under 7(ii)(a) of the EIA Notification 2006 is a proposed mining project in Kondekasa, Dondi, Balod, Chhattisgarh. The site covers 46.9 acres.

Who is building it?

The applicant is Steel Authority of India LTD.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Kondekasa, Dondi, Balod, Chhattisgarh.

How big is it?

It has a stated cost of ₹600 crore and a site of 46.9 acres.

When was it filed?

The application was filed on 31 Oct 2026.

Project details

StatusUnder environmental review
Status since18 Nov 2026
Application filed31 Oct 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantSteel Authority of India LTD
Land area46.9 acres (19 ha)
Project cost₹600 crore
Village / localityKondekasa
Taluk / tehsilDondi
DistrictBalod
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-04353

In context

70 applications in Balod since January 2022 are in the same category (Mining): 23 approved, 16 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 46.9 acres, this one is larger than 84% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Kondekasa, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Steel Authority of India LTD in Balod

4 Steel Authority of India projects in Balod
All 51 Steel Authority of India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.