What is this project?
Amendment in Ec for Change in the Project Land of Already Existing Integrated Steel Plant (3.6 Mtpa) at Raigarh, Chhattisgarh is a lapsed industrial project in Chiraipani, Raigarh, Chhattisgarh. The site covers 1,732 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
No. The application was lapsed on 29 Sept 2026, so it is no longer under consideration.
Where is it?
In Chiraipani, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹9,962.3 crore and a site of 1,732 acres.
When was it filed?
The application was filed on 10 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Sept 2026 |
| Application filed | 10 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Jindal Steel Limited |
| Land area | 1,732 acres (700.9 ha) |
| Project cost | ₹9,962.3 crore |
| Village / locality | Chiraipani |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03297 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,732 acres, this one is larger than 96% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiraipani, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance granted for Integrated Steel plant (3.6… — environmental approval granted, 150 m away
- Application for "No Increase in Pollution Load" Certificate for Expansion of… — initial checks, 650 m away
- Expansion of Steel Production from 3.60 MTPA to 4.0 MTPA — initial checks, 700 m away
- Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude… — under environmental review, 800 m away
- Establishment of Cement Plant — under forest review, 1.5 km away
- Establishment of Cement Plant — forest land use approved, 1.5 km away
- Total Area of Land Diverted to Jindal Steel and Power Limited for Non-Forestry… — in-principle approval, conditions pending, 1.9 km away
- M/s Chiraipani Quartzite Quarry — under environmental review, 2 km away
More from Jindal Steel Limited in Raigarh
- Gare Palma IV/6 Coal Mine (4 Mtpa) and Coal Washery (4 Mtpa) in an Ml Area of… — under environmental review
- Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude… — under environmental review
- Transfer of Environmental Clearance granted for Integrated Steel plant (3.6… — environmental approval granted
- Transfer of Environmental Clearance granted for Cement Plant at Raigarh,… — environmental approval granted
- Application for "No Increase in Pollution Load" Certificate for Expansion of… — initial checks
- 4x150 MW coal based Thermal Power Plant located at Dongamahua, Tehsil-Tamnar,… — environmental approval granted
8 Jindal Steel projects in Raigarh
All 39 Jindal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.