Quick answers
What is this project?
Application for "No Increase in Pollution Load" Certificate for Expansion of Submerged Arc Furnace from 60,000 TPA (EC Approved) to 72,000 TPA under Para 7 (ii)(b) of EIA Notification, 2006 is a proposed project in Chiraipani, Raigarh, Chhattisgarh. The site covers 1,913 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Chiraipani, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹165.6 crore and a site of 1,913 acres.
When was it filed?
The application was filed on 10 Dec 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 10 Dec 2025 |
| Application filed | 10 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Jindal Steel Limited |
| Land area | 1,913 acres (774.2 ha) |
| Project cost | ₹165.6 crore |
| Village / locality | Chiraipani |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02417 |
In context
10 applications in Raigarh since January 2022 are in the same category (Other): 1 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. At 1,913 acres, this one is larger than 70% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiraipani, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Production from 3.60 MTPA to 4.0 MTPA — initial checks, 100 m away
- Transfer of Environmental Clearance granted for Integrated Steel plant (3.6… — environmental approval granted, 500 m away
- Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude… — under environmental review, 600 m away
- Amendment in Ec for Change in the Project Land of Already Existing Integrated… — lapsed, 650 m away
- Total Area of Land Diverted to Jindal Steel and Power Limited for Non-Forestry… — in-principle approval, conditions pending, 1.2 km away
- Establishment of Cement Plant — under forest review, 1.6 km away
- Establishment of Cement Plant — forest land use approved, 1.6 km away
- Expansion from rail forging unit of capacity 15000 TPA to Integrated Steel… — lapsed, 1.9 km away
More from Jindal Steel Limited in Raigarh
- Gare Palma IV/6 Coal Mine (4 Mtpa) and Coal Washery (4 Mtpa) in an Ml Area of… — under environmental review
- Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude… — under environmental review
- Amendment in Ec for Change in the Project Land of Already Existing Integrated… — lapsed
- Transfer of Environmental Clearance granted for Integrated Steel plant (3.6… — environmental approval granted
- Transfer of Environmental Clearance granted for Cement Plant at Raigarh,… — environmental approval granted
- 4x150 MW coal based Thermal Power Plant located at Dongamahua, Tehsil-Tamnar,… — environmental approval granted
8 Jindal Steel projects in Raigarh
All 39 Jindal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.