Quick answers
What is this project?
Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude Steel at Raigarh, Chhattisgarh is a proposed industrial project in Barmunda, Raigarh, Chhattisgarh. The site covers 2,684.5 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Barmunda, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹77,414 crore and a site of 2,684.5 acres.
When was it filed?
The application was filed on 20 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 20 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jindal Steel Limited |
| Land area | 2,684.5 acres (1,086.4 ha) |
| Project cost | ₹77,414 crore |
| Village / locality | Barmunda |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03631 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2,684.5 acres, this one is larger than 98% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barmunda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Production from 3.60 MTPA to 4.0 MTPA — initial checks, 600 m away
- Application for "No Increase in Pollution Load" Certificate for Expansion of… — initial checks, 600 m away
- Transfer of Environmental Clearance granted for Integrated Steel plant (3.6… — environmental approval granted, 650 m away
- Amendment in Ec for Change in the Project Land of Already Existing Integrated… — lapsed, 800 m away
- Establishment of Cement Plant — under forest review, 950 m away
- Establishment of Cement Plant — forest land use approved, 950 m away
- Total Area of Land Diverted to Jindal Steel and Power Limited for Non-Forestry… — in-principle approval, conditions pending, 1.4 km away
- Expansion from rail forging unit of capacity 15000 TPA to Integrated Steel… — lapsed, 1.5 km away
More from Jindal Steel Limited in Raigarh
- Gare Palma IV/6 Coal Mine (4 Mtpa) and Coal Washery (4 Mtpa) in an Ml Area of… — under environmental review
- Amendment in Ec for Change in the Project Land of Already Existing Integrated… — lapsed
- Transfer of Environmental Clearance granted for Integrated Steel plant (3.6… — environmental approval granted
- Transfer of Environmental Clearance granted for Cement Plant at Raigarh,… — environmental approval granted
- Application for "No Increase in Pollution Load" Certificate for Expansion of… — initial checks
- 4x150 MW coal based Thermal Power Plant located at Dongamahua, Tehsil-Tamnar,… — environmental approval granted