Quick answers
What is this project?
Transfer of Environmental Clearance granted for Integrated Steel plant (3.6 MTPA) and Captive Power Plant at Raigarh, Chhattisgarh is an approved industrial project in Parsada, Raigarh, Chhattisgarh. The site covers 1,913 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Oct 2026), as of 27 Nov 2026.
Where is it?
In Parsada, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹9,962.3 crore and a site of 1,913 acres.
When was it filed?
The application was filed on 4 Jun 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 4 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Jindal Steel Limited |
| Land area | 1,913 acres (774.2 ha) |
| Project cost | ₹9,962.3 crore |
| Village / locality | Parsada |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03185 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,913 acres, this one is larger than 97% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parsada, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Ec for Change in the Project Land of Already Existing Integrated… — lapsed, 150 m away
- Application for "No Increase in Pollution Load" Certificate for Expansion of… — initial checks, 500 m away
- Expansion of Steel Production from 3.60 MTPA to 4.0 MTPA — initial checks, 600 m away
- Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude… — under environmental review, 650 m away
- Establishment of Cement Plant — under forest review, 1.5 km away
- Establishment of Cement Plant — forest land use approved, 1.5 km away
- Total Area of Land Diverted to Jindal Steel and Power Limited for Non-Forestry… — in-principle approval, conditions pending, 1.7 km away
- M/s Chiraipani Quartzite Quarry — under environmental review, 2.1 km away
More from Jindal Steel Limited in Raigarh
- Gare Palma IV/6 Coal Mine (4 Mtpa) and Coal Washery (4 Mtpa) in an Ml Area of… — under environmental review
- Expansion of Existing Integrated Steel Plant From 3.6 Mtpa to 12.6 Mtpa Crude… — under environmental review
- Amendment in Ec for Change in the Project Land of Already Existing Integrated… — lapsed
- Transfer of Environmental Clearance granted for Cement Plant at Raigarh,… — environmental approval granted
- Application for "No Increase in Pollution Load" Certificate for Expansion of… — initial checks
- 4x150 MW coal based Thermal Power Plant located at Dongamahua, Tehsil-Tamnar,… — environmental approval granted
8 Jindal Steel projects in Raigarh
All 39 Jindal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.