Quick answers
What is Dondi Iron Ore Block?
Dondi Iron Ore Block is a proposed mining project in Dondi Protected Forest, Dondi, Balod, Chhattisgarh. The site covers 69.8 acres.
Who is building it?
The applicant is Rishabh Mittal.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dondi Protected Forest, Dondi, Balod, Chhattisgarh.
How big is it?
It has a stated cost of ₹14 crore and a site of 69.8 acres.
When was it filed?
The application was filed on 20 Jul 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Dondi Iron Ore Block
Project details
| Status | More information requested |
|---|---|
| Status since | 31 Aug 2026 |
| Application filed | 20 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rishabh Mittal |
| Land area | 69.8 acres (28.3 ha) |
| Project cost | ₹14 crore |
| Village / locality | Dondi Protected Forest |
| Taluk / tehsil | Dondi |
| District | Balod |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03330 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jul 2026 (this page) | More information requested | 69.8 acres | ₹14 crore |
| Early planning filed 10 Oct 2025 | Cleared for impact study | 69.8 acres | ₹14 crore |
In context
70 applications in Balod since January 2022 are in the same category (Mining): 23 approved, 16 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 69.8 acres, this one is larger than 88% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Dondi Protected Forest, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dondi Iron Ore Block — cleared for impact study, 0 m away
- Geeta Minerals — forest land use approved, 0 m away
- Drilling of 62 Nos of Exploratory Bore Hole Upto 6" Diameter for Prospecting… — forest land use approved, 4.6 km away
- Thakurtola Iron Ore Block- Bore Hole — forest land use approved, 6.5 km away
- Proposed Thakurtola Iron Ore Block over an area of 64.77 Ha — under environmental review, 6.5 km away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — lapsed, 7.4 km away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — cleared for impact study, 7.4 km away
- Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases… — under environmental review, 9.3 km away
More from Rishabh Mittal in Balod
- Geeta Minerals — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.