Quick answers
What is Geeta Minerals?
Geeta Minerals is an approved mining project in Dondi Protected Forest, Dondi, Balod, Chhattisgarh. The site covers 62.4 acres.
Who is building it?
The applicant is Rishabh Mittal.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 2 May 2026), as of 27 Nov 2026.
Where is it?
In Dondi Protected Forest, Dondi, Balod, Chhattisgarh.
How big is it?
It has a stated cost of ₹10 crore; a site of 62.4 acres and 62.4 acres (25.3 ha) of forest land.
When was it filed?
The application was filed on 8 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 2 May 2026 |
| Application filed | 8 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Rishabh Mittal |
| Land area | 62.4 acres (25.3 ha) |
| Forest land | 62.4 acres (25.3 ha) |
| Project cost | ₹10 crore |
| Village / locality | Dondi Protected Forest |
| Taluk / tehsil | Dondi |
| District | Balod |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03820 |
In context
70 applications in Balod since January 2022 are in the same category (Mining): 23 approved, 16 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 62.4 acres, this one is larger than 87% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Dondi Protected Forest, Dondi, Balod, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dondi Iron Ore Block — more information requested, 0 m away
- Dondi Iron Ore Block — cleared for impact study, 0 m away
- Drilling of 62 Nos of Exploratory Bore Hole Upto 6" Diameter for Prospecting… — forest land use approved, 4.6 km away
- Thakurtola Iron Ore Block- Bore Hole — forest land use approved, 6.5 km away
- Proposed Thakurtola Iron Ore Block over an area of 64.77 Ha — under environmental review, 6.5 km away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — lapsed, 7.4 km away
- Proposed Dallirajhara Iron Ore Mining Block (ML Area - 80 ha) with Iron Ore… — cleared for impact study, 7.4 km away
- Expansion in Final Product (Iron Ore Pellets) Capacity up to 40% in Two Phases… — under environmental review, 9.3 km away
More from Rishabh Mittal in Balod
- Dondi Iron Ore Block — more information requested
- Dondi Iron Ore Block — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.