Quick answers
What is this project?
Proposed Expansion of Synthetic Organic Chemicals (Reactive Dyes)manufacturing Unit Having Total Capacity of 350 Mt/Month by M/S. Roop Dyes and Intermediates is an approved industrial project in Wadhwan (M), Wadhwan, Surendranagar, Gujarat. The site covers 0.6 acres.
Who is building it?
The applicant is Roop Dyes & Intermediates.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Oct 2022), as of 27 Nov 2026.
Where is it?
In Wadhwan (M), Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹4.7 crore and a site of 0.6 acres.
When was it filed?
The application was filed on 13 Oct 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Oct 2022 |
| Application filed | 13 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Roop Dyes & Intermediates |
| Land area | 2,300 m² |
| Project cost | ₹4.7 crore |
| Village / locality | Wadhwan (M) |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00175 |
In context
22 applications in Surendranagar since January 2022 are in the same category (Industry): 13 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 0.6 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wadhwan (M), Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Imperial Mall — environmental approval granted, 1.3 km away
- 90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future… — forest land use approved, 3.6 km away
- 90mm Dia PE GAS Pipeline for laid on Both Side of SH-17 for BAPS Temple… — forest land use approved, 6 km away
- Shi Mathurbhai Valjibhai Sakriya — environmental approval granted, 8.7 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — more information requested, 9.8 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — lapsed, 9.8 km away
- Industrial project by M/s. T4 Tapes Pvt. Ltd. — environmental approval granted, 10.5 km away
- Shri Hakubhai Samantbhai Dhandhal — not approved, 10.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.